Contact
19-04038 Office or Bank Building
Address:
1950 NW MYHRE RD
SILVERDALE,  WA  98383
Parcel #: 162501-4-102-2007
Status: Permit has been re-issued (after expiration or after being revised).
Submitted: 8/30/2019
Approved:
Issued: 12/19/2019
Closed:
Expires: 7/18/2021
Inspections:
Required: 32
Complete: 11
Total Fees:
$200,13487
Additional fees may be required
Project: HARRISON SPECIALTY CARE CLINIC - Specialty Medical Clinic w/ Multi-Level Parking

Public Notice
Description Begin Date End Date

Contacts
:
HARRISON MEMORIAL HOSPITAL
:
KPFF CONSULTING ENGINEERS
:
Chuck Kolb
:
Ottele, Sarah
:
The Rush Companies Attn: Sherry Eshenbaugh
:
The Rush Companies Attn: Hector Fragoso
:
The Rush Companies Attn: Hector Fragoso
:
NBBJ - Matthew Powell
:
CHI Franciscan
:
Chris Kreifels
:
The Rush Companies Attn: Sherry Eshenbaugh
:
The Rush Companies Attn: Sherry Eshenbaugh
:
Kelsey Benscoter
:
NBBJ - Scott Lockwood
:
Tyler Sliva

Contractors
GENERAL:
Rush Commercial Construction
License #: RUSHCC*913JG

Details
Impact Fee Land Category: 720
Impact Fee Units: 65640

Parcels
Parcel(s) associated with your permit.
Parcel Owner Address
162501-4-102-2007 HARRISON MEMORIAL HOSPITAL 1780 NW MYHRE RD
SILVERDALE,  WA 98383

Submittals

Upload documents in PDF format on the following screen. The name of each file should simply identify what each submittal document is. Examples: “Floor Plans”, “Engineered Structural Plans”, "Engineered Civil Plans", “Site Plan”

Click the files link on the far right of the submittal item to upload. The files link will indicate how many documents have been uploaded.

Not uploading all required submittal documents will delay the processing of your permit.

Submittal Required Received Accepted
Miscellaneous inspection documents Yes 8/17/2020
Approved Permit Documents and Plans: Print all files and keep onsite for inspections Yes 12/19/2019 12/19/2019
Information Request: Upload a letter response AND any revised, corrected, or additional documentation. No 12/20/2019 12/20/2019
Please Download and Review All Documents: This line contains your detailed information request and when applicable, permit documents with reviewer comments Yes 12/4/2019 12/4/2019
Upload Required Permit Documents as listed on your Required Permit Questionnaire at http://kcowa.us/permitapp No 9/27/2019 10/7/2019

Approval Steps
Follow your application through the approval process.
Step Status Date
Application has been submitted and is pending acceptance Approved 10/6/2019
Impact Fee Review Approved 11/8/2019
PW - Concurrency Test Review Approved 11/12/2019
Permit Center Processing - Building Approved 10/8/2019
Plans sent to third party for review due to permit volume Approved 7/24/2020
Health District Approval Processing for Building Permits Approved 9/26/2019
Environmental Review Approved 11/12/2019
Review for compliance with non-motorized access requirements Approved 11/12/2019
Planning/Zoning Compliance Review Approved 12/19/2019
Stormwater Review Approved 11/4/2019
Building Code Plan Review Approved 12/19/2019
Fire Marshal Review Approved 10/9/2019
Road Approach Research Approval Step Not Required (Deleted) 10/8/2019
Road Approach Approval Approval Step Not Required (Deleted) 10/8/2019
Public Works Sewer Division Approved per Public Works 11/18/2019
Addressing, Verification/Assignment Approved 10/25/2019
PW - ROW Review Approved 11/1/2019

Reviews
Start Complete Applicant Response
10/7/2019 12/3/2019 12/19/2019
12/19/2019 12/19/2019 12/19/2019

Fixtures
Fixture Quantity Per Unit Value
C-Compressors 12 $0.00 $0.00
C-Air-Handling Unit < 10,000 CFM 90 $0.00 $0.00
C-Unit Heater Suspended or Floor Mount 1 $0.00 $0.00
C-Bath Fan and/or Exhaust Fan 7 $0.00 $0.00
Toilet/Water Closet/Biddet/Urinal 32 $0.00 $0.00
C-Floor Sink and/or Indirect Waste 2 $0.00 $0.00
C-Roof Drain 10 $0.00 $0.00
C-Commercial Water Heater 2 $0.00 $0.00
C-Sink (Lavatory, Kitchen, Mop, or Bar Sink) 172 $0.00 $0.00
C-Commercial Hose Bibbs, each 13 $0.00 $0.00
C-Commercial Floor Drain 5 $0.00 $0.00
C-Drinking Fountain 2 $0.00 $0.00
C-Miscellaneous Plumbing fixtures on one trap 30 $0.00 $0.00
C-Backflow protective device 2 inches or less 3 $0.00 $0.00
C-ROOFTOP HVAC UNIT 3 $0.00 $0.00
Total: $0.00

Valuations

Valuations and fees will be validated during the review process.

Valuation Quantity Rate Value
B Business (Office) - Type II-A - Enter Square Footage 32740.00 $182.90  / SQFT $5,988,146.00
B Business (Office) - Type II-A - Enter Square Footage 32900.00 $182.90  / SQFT $6,017,410.00
S-2 Storage, Low Hazard - Type II-B - Enter Square Footage 29803.00 $90.40  / Sqft $2,694,191.20
S-2 Storage, Low Hazard - Type II-B - Enter Square Footage 27100.00 $90.40  / Sqft $2,449,840.00
S-2 Storage, Low Hazard - Type II-B - Enter Square Footage 29220.00 $90.40  / Sqft $2,641,488.00
Total: $19,791,075.20

Fees

Fee totals below may not reflect all fees, including fees calculated by hourly rates.

Fee Amount
Certificate of Occupancy $130.00
Road Impact Fee With CPI Modifier $0.00
Building Permit Fee, Commercial (all except TI) $197,910.76
State Surcharge Commercial $25.00
Technology Fee $1,979.11
Permit Center Base Fee $90.00
Commercial Mechanical and Plumbing Fee $0.00
Total : $200,134.87

Bonds
Type Number Amount Issued Expires Completed

Inspections

The inspections listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit has been issued, all inspections listed are applicable to your permit. Note: Community Development Building Final Inspections (B-Final), Commercial CO Inspection Fire Marshal (FM-CO-Final) and the Final Field Inspections (DE-FFI) are not eligible for next day inspection requests. Please allow two business days when requesting a Final inspection.

Completed On
Commerical Ceiling Grid Inspection
Commercial Ductless Split System 12/17/2020
Commercial Mechanical, Roof-top Unit 12/17/2020
Commercial Mechanical, HVAC Duct System Inspection
Residential Fire Rated Wall Assembly Inspection
Commercial Fire Rated Shaft Inspection
Commercial General Inspection or Consultation
Commercial Foundation, Slab Inspection
Commercial Plumbing, Underground Piping Inspection 6/9/2020
Commerical Drainage inspection prior to backfill 3/3/2020
Commerical Special Inspection required, to be conducted by 3rd Party, See Permit Conditions 1/8/2020
Commercial Mandatory pre-inspection 11/21/2019
Commerical Special Inspection required, to be conducted by 3rd Party, See Permit Conditions
Commercial Temporary Silt & Erosion Control. ----------- Note: This is not a standalone inspection, it will be done with all building inspections and will not be approved until final inspection. You will not need to request this inspection unless you're instructed to by your Inspector.
Commercial Foundation, Footing Inspection
Commercial Foundation, Stem Wall Inspection
Commercial Underfloor framing (prior to sub-floor) 2/12/2020
Commercial Exterior Shear Wall Nailing Inspection
Commercial Interior Shear Wall Nailing Inspection 1/26/2021
Commercial Mechanical, Ventilation Rough-In Inspection
Commercial Plumbing, Rough-In Inspection 11/19/2020
PW Sewer Inspection
Commercial Framing Inspection
Commercial Insulation Inspection
Commercial Gypsum Wallboard Inspection 1/19/2021
Inspect site for compliance with land use conditions
Landscape Inspection
Road Approach - Final 1/26/2021
Commercial Final Building Inspection
Commercial CO Inspection Fire Marshal
Final Field Inspection
Landscape Inspection

Structures
Structure Use Occupancy Type Square Footage
HARRISON SPECIALTY CARE CLINIC - Specialty Medical Clinic w/ Multi-Level Parking Medical Service Business, professional or service / Storage, low hazard 151790

Conditions

The conditions listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit is issued, all conditions listed are applicable to your permit.

Permit Expiration: Building permits expire 365 days after permit issuance, or 180 days after the last approved inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. Additional fees may be due to reactivate the permit.
ELECTRICAL WORK. If electrical work is proposed, a separate electrical permit is required. You can contact Labor and Industries (L&I) at www.lni.wa.gov to obtain an electrical permit. Electrical systems must be inspected by L&I prior to requesting a framing inspection and final approval granted prior to requesting a final building inspection from the Department of Community Development.
Reinspection Fee: All approved plans for this permit and the printed building permit with conditions are required to be on-site for inspection purposes, and work to be inspected shall be complete and ready for inspection. If an inspection is called for and plans are not available on site, or the work is not ready for inspection, or if previously identified corrections have not been made, approval will not be granted. In addition, a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
Final Inspection Required: All building permits shall have a final inspection performed and approved by the Kitsap County Department of Community Development prior to permit expiration. The failure to request a final inspection or failure to obtain final approval prior to expiration will be documented in the legal property records on file with Kitsap County as being non-compliant with Kitsap County ordinances and building regulations and will be referred to Kitsap County Code Compliance for action.
Certificate of Occupancy. All buildings require a certificate of occupancy. No building or structure shall be used or occupied, until a final inspection has been approved and a certificate of occupancy issued. Issuance of a certificate of occupancy shall not be construed as an approval of any violation of the provisions of this code or of other ordinances of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or other ordinances of the jurisdiction shall not be valid.
A separate permit is required for each proposed sign.
CO Revision Checklist: The following checklist is provided to help you prepare for the Certificate of Occupancy (CO) inspection. Please use it to perform your own building and fire safety check prior to requesting an inspection. Some of the most frequently overlooked, common safety items that should be verified are: 1. Exits, corridors, stairs and ramps: a. Unobstructed; b. No deadbolts on any other exit doors except for the main entrance; (with appropriate verbiage applied) c. Illuminated exit signs working and battery backup is operational; d. Handrails on stairs and ramps. 2. Building address is clearly posted as required, and visible from the road. 3. Fire extinguishers: a. Serviced within the last year or recently purchased with manufacturer's tag attached and dated; b. Minimum size 2-A:10-B:C; c. Mounted near the exit(s) no higher than 5 feet above the floor. 4. Combustible storage: a. At least 24 inches below the ceiling; b. Not located within required aisles; c. Not located in combustible attic space or crawl space; d. Not located in mechanical rooms. 5. Flammable liquids and hazardous materials: a. Quantities appropriate for use and storage, and consistent with amounts stated within application documents; b. Materials stored in close proximity to each other are compatible with each other; c. Stored in approved flammable liquid storage cabinet if quantities exceed 10 gallons; 6. Cooking operations: a. Hood and duct suppression system for any cooking that can produce grease-laden vapors; b. Class K fire extinguisher for deep fat frying operations. 7. Electrical a. Service panel is clear and unobstructed; b. Extension cords are not used for any form of permanent wiring; c. All temporary electrical cords in good condition; d. Electrical system and any modifications have been inspected and approved by the Department of Labor & Industries.
Commercial Address: Numerals for commercial buildings shall be conspicuously displayed on a contrasting background and shall be a minimum of 12 inches in height with a minimum stroke of 1-1/2 inches when within 50 feet of the way of travel. Buildings located between 50 and 100 feet from the way of travel shall have numerals a minimum height of 18 inches with a minimum stroke of 2 inches. Buildings located more than 100 feet from the way of travel shall have numerals a minimum of 24 inches in height with a minimum stroke of 2-1/2 inches. Numerals designating suite numbers shall be a minimum of 4 inches in height. All sizes may be reduced by 50 percent if numerals are illuminated 24 hours per day. If the building is not clearly visible from a named way of travel, the numerical designation (address) shall also be displayed near the main entrance to the property as well as at the driveway entrance that leads to the building. Property addresses shall be posted prior to requesting any inspections. If property addresses are not posted upon inspection, inspection will not be approved and a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
Prior to final building inspection scheduling, all work associated with SDAP (18-01865) shall be completed and a satisfactory final SDAP inspection obtained.
This permit shall comply with all Kitsap Public Health District regulations and conditions of approval.
Landscaping shall be installed and maintained in conformance with the requirements of Kitsap County Code (KCC) 17.500. Landscaping shall be installed and inspected prior to requesting a final inspection, or guaranteed by means of an assignment of funds or bonded in the amount of 150 percent of the cost of installation.
The uses of the subject property are limited to the uses proposed by the applicant and any other uses will be subject to further review pursuant to the requirements of the Kitsap County Code (KCC). Unless in conflict with the conditions stated and/or any regulations, all terms and specifications of the application shall be binding conditions of approval. Approval of this project shall not, and is not, to be construed as approval for more extensive or other utilization of the subject property.
Existing approach is acceptable. However, any improvements or installation of another approach on this parcel will require a new road approach permit.
Drainage mitigation method: Site Development Activity Permit (SDAP) All site plan construction and stormwater systems shall be installed as designed per SDAP #18-01865: Stormwater mitigation that does not match the approved SDAP will not be allowed without further SDAP review by Kitsap County Department of Community Development
Subject to the conditions of the Geotechnical report associated with this permit and on file at the Department of Community Development.
Sidewalks ar4ound parking areas to be approved as part of the SDAP.
Permit issued FOR FOUNDATION ONLY. All other reviews and approval to proceed past the foundation state requires a revision application for this permit.
Consistent with the approved civil site plan, dated 10/21/2019 per KCC 17.420.030.E Design Standards, enhance the proposed pedestrian access connect to ADA standards from the parking area to the sidewalk to prevent pedestrians from walking through the parked automobiles.
Separate permit required for Emergency Responder Radio Coverage System, where radio coverage is found to be deficient.

Required Permits
Type Requirement For Number Status
Fire Alarm - New System or Major Modification Close 20-01649 Finaled
Miscellaneous - Construction Close
Fire Sprinkler - Above Ground New System or Major Modification Close 20-00290 Issued
Fire Sprinkler - Underground New System Close 19-05672 Finaled
Retaining Wall - Commercial Close 20-01040 Finaled
Revision to an Approved or Issued Commercial Permit No 19-04038R3 ReadyToIssue

Notes
Update 2/20/20 per Kristi Wlodarchak, the permit has been reviewed and approved in full. Released the Foundation Only Hold and removed "Foundation Only from the project description. VGBassen Permit issued FOR FOUNDATION ONLY. All other reviews and approval to proceed past the foundation state requires a revision application for this permit. NO INSPECTIONS BEYOND FOOTINGS AND FOUNDATIONS AUTHORIZED without approval of David Lynam. 12/17/2019

Associations