Contact
20-03749 Fire Sprinkler - Underground New System
Address:
1740 NE FUSON RD
BREMERTON,  WA  98311
Parcel #: 362501-2-013-2005
Status: Permit has been issued to applicant.
Submitted: 8/18/2020
Approved: 8/24/2020
Issued: 8/25/2020
Closed:
Expires: 7/25/2021
Inspections:
Required: 4
Complete: 3
Total Fees:
$21635
Additional fees may be required
Project: UNITED MOVING AND STORAGE - Remove Hydrant & Cap Waterline 8" DI Waterline, DDCV Vault & Fireline

Public Notice
Description Begin Date End Date

Contacts
:
LOIDHAMER, CRAIG L
:
Theresa Ablitt with FPH Construction
:
UNITED MOVING & STORAGE

Contractors
GENERAL:
FPH CONSTRUCTION INC
License #: FPHCOI*066JR
CERT LIABILITY INS:
TALBOT EXCAVATING
License #: BKA55568836

Details

Parcels
Parcel(s) associated with your permit.
Parcel Owner Address
362501-2-013-2005 5900 STATE HWY 303 LLC 1740 NE FUSON RD
BREMERTON,  WA 98311

Submittals

Upload documents in PDF format on the following screen. The name of each file should simply identify what each submittal document is. Examples: “Floor Plans”, “Engineered Structural Plans”, "Engineered Civil Plans", “Site Plan”

Click the files link on the far right of the submittal item to upload. The files link will indicate how many documents have been uploaded.

Not uploading all required submittal documents will delay the processing of your permit.

Submittal Required Received Accepted
Miscellaneous inspection documents No 2/2/2021 n/a
Approved Permit Documents and Plans: Print all files and keep onsite for inspections Yes 8/25/2020 8/25/2020
Upload Required Permit Documents as listed on your Required Permit Questionnaire at http://kcowa.us/permitapp Yes 8/18/2020 8/19/2020

Approval Steps
Follow your application through the approval process.
Step Status Date
Application has been submitted and is pending acceptance Approved 8/19/2020
Permit Center Processing - Building Approved 8/24/2020
Fire Marshal Review Approved 8/24/2020

Reviews
Start Complete Applicant Response

Fixtures
Fixture Quantity Per Unit Value
Total: $0.00

Valuations

Valuations and fees will be validated during the review process.

Valuation Quantity Rate Value
Bid Price - Enter cost & installation for project 4230.00 $1.00  / Each $4,230.00
Total: $4,230.00

Fees

Fee totals below may not reflect all fees, including fees calculated by hourly rates.

Fee Amount
Permit Center Base Fee $90.00
Technology Fee $3.68
New Automatic Sprinkler Install/Mod exceeding 20 heads $122.67
Total : $216.35

Bonds
Type Number Amount Issued Expires Completed

Inspections

The inspections listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit has been issued, all inspections listed are applicable to your permit. Note: Community Development Building Final Inspections (B-Final), Commercial CO Inspection Fire Marshal (FM-CO-Final) and the Final Field Inspections (DE-FFI) are not eligible for next day inspection requests. Please allow two business days when requesting a Final inspection.

Completed On
Fire Inspection, Underground Hydro 1/21/2021
Fire Inspection, Underground Cover 1/14/2021
Fire Inspection, Underground Flush 1/26/2021
Fire Sprinkler Acceptance Test, coordinated with fire alarm test

Structures
Structure Use Occupancy Type Square Footage
UNITED MOVING AND STORAGE - Remove Hydrant & Cap Waterline 8" DI Waterline, DDCV Vault & Fireline

Conditions

The conditions listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit is issued, all conditions listed are applicable to your permit.

FIRE CODE INSPECTION(S) REQUIRED PRIOR TO INITIAL USE OR OPERATION. The initial use or operation shall not be conducted until appropriate inspections or tests have been performed and approved. Please call (360) 337-5777 to schedule an inspection. A minimum of 2 business days advance notice is necessary and is not guaranteed.
A FIRE CODE PERMIT MUST BE ISSUED AND POSTED PRIOR TO OCCUPANCY OR OPERATION. The original Fire Code Permit placard must be posted in a conspicuous place on the premises, or in an area where all permits and certificates of occupancy are posted, visible and available to the Fire Code Official during inspection.
THE FIRE CODE PERMIT IS FOR A SINGLE USE. The Fire Code Permit is for a single use or operation and expires upon the completion of such use or operation.
CONTINUED USE AND OPERATION. Following initial approval, continued use and operation is subject to the Kitsap County Fire Marshal's Commercial Inspection Program, pursuant to RCW 36.43.030 and Kitsap County Code, Chapter 14.08.040. Periodic inspections will be conducted to ensure continued compliance with code requirements. Failure to allow an inspection will result in immediate revocation of the permit.
SCOPE. Approval and issuance of the permit is limited to the use and operation on the permit. The use or operation may not be expanded or changed without further application review and approval.
EXPIRATION An operational permit shall remain in effect until reissued, renewed or revoked or for such a period of time as specified on the permit. Construction permits shall automatically become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work commenced.
REVOCATION. The Fire Marshal shall revoke a permit issued under the provisions of the International Fire Code when it is found by inspection or otherwise that there has been a false statement or misrepresentaion as to the material facts in the application or construction documents. The permit shall only be used for the location or establishment that for which it was issued. The permit is used for a condition or activity other than that listed on the permit. The permit is used by a different person or firm other than the name for which it was issued. Conditions and limitations set forth in the permit have been violated.

Required Permits
Type Requirement For Number Status

Associations