Contact
16-02717 Garage/Carport/Shed or Accessory Structure - Residential
Address:
15290 ANGELO STRADA PL SE
OLALLA,  WA  98359
Parcel #: 4862-002-004-0308
Status: Closed Finaled - All work is done on the permit including all inspections and Bonds.
Submitted: 6/17/2016
Approved: 10/7/2016
Issued: 10/10/2016
Closed: 2/10/2021
Expires: 8/9/2021
Inspections:
Required: 21
Complete: 21
Total Fees:
$2,91049
Additional fees may be required
Project:

Public Notice
Description Begin Date End Date

Contacts
:
TOM HERSTAD BUILDING DESIGN
:
HODGE ENGINEERING
:
BRITTON CHRISTINA M & TAYLOR MARIE E
:
BRITTON CHRISTINA M & TAYLOR MARIE E

Contractors

Details

Parcels
Parcel(s) associated with your permit.
Parcel Owner Address
4862-002-004-0308 BRITTON PAUL T & CHRISTINA M 15290 ANGELO STRADA PL SE
OLALLA,  WA 98359

Submittals

Upload documents in PDF format on the following screen. The name of each file should simply identify what each submittal document is. Examples: “Floor Plans”, “Engineered Structural Plans”, "Engineered Civil Plans", “Site Plan”

Click the files link on the far right of the submittal item to upload. The files link will indicate how many documents have been uploaded.

Not uploading all required submittal documents will delay the processing of your permit.

Submittal Required Received Accepted
Miscellaneous inspection documents No n/a
Completed Online Permit Form Yes 6/17/2016 n/a
Supplemental Application Yes 6/17/2016 n/a
Mechanical/Plumbing Supplemental Application Yes 6/17/2016 n/a
Site Plans Yes 9/14/2016 n/a
Kitsap Public Health District Documentation Yes 9/14/2016 n/a
Residential Onsite Stormwater Management & Pollution Prevention Plans Worksheet Yes 6/17/2016 n/a
Construction Plans Yes 9/14/2016 n/a
Submittal of a Recorded Document No 10/10/2016 n/a
Traffic covenant No 5/16/2018 n/a

Approval Steps
Follow your application through the approval process.
Step Status Date
Health District Approval Processing for Building Permits Approved 9/14/2016
Environmental Review Approved 9/19/2016
Residential Zoning Review Approved 9/15/2016
Stormwater Review Approved 10/7/2016
Building Code Plan Review Approved 9/23/2016
Road Approach Approval Approved 9/15/2016
PW - ROW Review Approval Step Not Required (Deleted) 8/1/2016

Reviews
Start Complete Applicant Response
6/17/2016 8/2/2016 9/14/2016
9/14/2016 10/7/2016 10/7/2016

Fixtures
Fixture Quantity Per Unit Value
R-LP or Natural Gas Water Heater Vent & Combustion Air 1 $0.00 $0.00
R-Sink (Lavatory, Kitchen, Mop or Bar Sink) 2 $0.00 $0.00
R-Tub and/or Shower Unit 1 $0.00 $0.00
R-Bath Fan and/or Exhaust Fan 1 $0.00 $0.00
R-Water Closet and/or Urinal 1 $0.00 $0.00
Total: $0.00

Valuations

Valuations and fees will be validated during the review process.

Valuation Quantity Rate Value
New unfinished, heated or unheated space - Enter Square Footage 1692.00 $43.93  / SQFT $74,329.56
New second floor of a garage used for storage only - Enter Square Footage 140.00 $43.93  / SQFT $6,150.20
New finished heated space - Enter Square Footage 708.00 $112.65  / SQFT $79,756.20
Total: $160,235.96

Fees

Fee totals below may not reflect all fees, including fees calculated by hourly rates.

Fee Amount
State Surcharge DCD $4.50
Permit Center Base Fee $90.00
Residential Mechanical and PlumbingFee $0.00
Building Permit Fee, Residential $2,788.11
Technology Fee $27.88
Total : $2,910.49

Bonds
Type Number Amount Issued Expires Completed

Inspections

The inspections listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit has been issued, all inspections listed are applicable to your permit. Note: Community Development Building Final Inspections (B-Final), Commercial CO Inspection Fire Marshal (FM-CO-Final) and the Final Field Inspections (DE-FFI) are not eligible for next day inspection requests. Please allow two business days when requesting a Final inspection.

Completed On
Pre-issuance inspection for Road Approach. 6/20/2016
Temporary Silt & Erosion Control Inspection 12/4/2020
Road approach form inspection prior to pour 12/4/2020
Foundation, Footing Inspection 11/21/2016
Foundation, Stem Wall Inspection 12/1/2016
Drainage inspection prior to backfill 12/13/2016
Shear Wall Nailing Inspection 2/24/2020
Framing Inspection 6/29/2020
Plumbing, Underground Piping Inspection 5/13/2019
Below Grade Slab Insulation Inspection 9/26/2019
Road Approach - Final 12/4/2020
Infiltration Pit - Stormwater System Inspection 6/9/2017
Health District Final (Final Must Be Approved Prior To Scheduling Final Building Inspection) 11/24/2020
Residential Plumbing, Rough-In Inspection 1/12/2021
Residential Mechanical, Ventilation Rough-In Inspection 1/12/2021
Residential Insulation Inspection 1/15/2021
Residential Gypsum Wallboard Inspection 1/25/2021
Final Building Inspection 2/10/2021
Requested permit extension 12/5/2017
Requested permit extension 6/3/2018
Requested permit extension 11/30/2018

Structures
Structure Use Occupancy Type Square Footage
BRITTON - Garage with bath Residential accessory structure, private garage, carport, deck, shed 2532

Conditions

The conditions listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit is issued, all conditions listed are applicable to your permit.

Permit Expiration: Building permits expire 365 days after permit issuance, or 180 days after the last approved inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. Additional fees may be due to reactivate the permit.
ELECTRICAL WORK. If electrical work is proposed, a separate electrical permit is required. You can contact L&I at 360-415-4000 to obtain an electrical permit. Electrical systems must be inspected by L&I prior to requesting a framing inspection and final approval granted prior to requesting a final building inspection from the Department of Community Development.
Reinspection Fee: All approved construction plans, the approved site plan, the printed building permit, and the permit inspection placard are required to be on-site for inspection purposes, and work to be inspected shall be complete and ready for inspection. If an inspection is called for and plans are not available on site, or the work is not ready for inspection, or if previously identified corrections have not been made, approval will not be granted. In addition, a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
Final Inspection Required: All building permits shall have a final inspection performed and approved by the Kitsap County Department of Community Development prior to permit expiration. The failure to request a final inspection or failure to obtain final approval prior to expiration will be documented in the legal property records on file with Kitsap County as being non-compliant with Kitsap County ordinances and building regulations and will be referred to Kitsap County Code Compliance for action.
Group U, non-habitable use only: This structure is limited to Group U occupancy use only (private garages, carports, sheds, and agricultural buildings.) Any other use will be in violation of the Kitsap County Building & Fire Code and Kitsap County Zoning Regulations unless a "Change of Use" permit is applied for, approved, issued and completed.
Unheated Structure: This structure is approved as un-heated space. If at any time this building is to be used for anything other than what it is approved for, a change of use permit shall be applied for, reviewed and approved prior to the change.
Residential Address: Numerals for residential building addresses shall be conspicuously displayed on a contrasting background and shall be a minimum of 4 inches in height with a minimum stroke of 1/2 inch. If the building is not clearly visible from a named way of travel, the numerical designation (address) shall also be displayed near the main entrance to the property as well as at the driveway entrance that leads to the building. Property addresses shall be posted prior to requesting any inspections. If property addresses are not posted upon inspection, inspection will not be approved and a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
Erosion and sedimentation control devices shall be installed in accordance with best management practices. Provide silt fence(s) along contours. Provide appropriate gravel construction entrance mat. Protect all exposed soils.
All structures shall have roof gutters. All gutters, downspouts, and yard drains must be directed at a minimum to splash blocks, (or an infiltration system, if required). Drains shall have a minimum 2% grade away from the foundation. All drainage discharges shall be located so that there is no adverse impact to downstream or adjacent properties.
This permit shall comply with all Kitsap Public Health District regulations and conditions of approval.
Construct per Section (AA) of the Exhibit. Grade approach to drain away from County Roadway. Pave approach from existing road to edge of Right of Way/Property line or 13 feet, whichever is greater. No culvert pipe required.
This permit shall comply with all of the conditions of approval of the land segregation for LOT 1, LARGE LOT NO. 351, RECORDED UNDER AUDITOR'S FILE NOS. 201008260126 AND 201008260127, IN VOLUME 2 OF LARGE LOTS, PAGE 233, BEING A PORTION OF LOT 4, BLOCK 2, OLALLA GARDEN TRACTS, AS PER PLAT RECORDED IN VOLUME 3 OF PLATS, PAGE 95, RECORDS OF KITSAP COUNTY, WASHINGTON
A 100-foot native vegetation buffer must be maintained along the delineated wetland boundary as depicted on the approved site. In addition, a building or impervious surface setback line of 15 feet is required from the edge of the buffer.
A 626 square foot roof infiltration pit is required for the garage, with a minimum depth of 24 inches; a minimum gravel depth of 18 inches; geotextile covering over the gravel; and minimum earth cover of 6 inches. Infiltration pit shall be inspected prior to covering, and shall be complete prior to scheduling a final building inspection.

Required Permits
Type Requirement For Number Status

Notes

Associations