18-04266 Single Family Residence - New
Address:
5271 HOSKIN HILL LN SE
PORT ORCHARD,  WA  98367
Parcel #: 102302-2-021-2006
Status: Permit has been re-issued (after expiration or after being revised).
Submitted: 8/28/2018
Approved: 8/2/2019
Issued: 8/5/2019
Closed:
Expires: 7/20/2021
Inspections:
Required: 21
Complete: 2
Total Fees:
$3,54680
Additional fees may be required
Project: SASAKI - Single family home <1,500 sq ft

Public Notice
Description Begin Date End Date

Contacts
:
SASAKI MIWA
:
Konos, Hiro

Contractors

Details
Impact Fee Land Category: 210
Impact Fee Units: 1

Parcels
Parcel(s) associated with your permit.
Parcel Owner Address
102302-2-021-2006 SASAKI MIWA 5271 HOSKIN HILL LN SE
PORT ORCHARD,  WA 98367

Submittals

Upload documents in PDF format on the following screen. The name of each file should simply identify what each submittal document is. Examples: “Floor Plans”, “Engineered Structural Plans”, "Engineered Civil Plans", “Site Plan”

Click the files link on the far right of the submittal item to upload. The files link will indicate how many documents have been uploaded.

Not uploading all required submittal documents will delay the processing of your permit.

Submittal Required Received Accepted
Approved Permit Documents and Plans: Print all files and keep onsite for inspections Yes 8/5/2019 8/5/2019
Information Request: Upload a letter response AND any revised, corrected, or additional documentation. No 7/19/2019 7/19/2019
Engineered construction plans No n/a
Customer Response Letter to Information Request No n/a
Completed Online Permit Form No 9/14/2018 9/18/2018
Site Plans No n/a
Construction Plans No n/a
Beam Calculations No 10/2/2018 10/10/2018
Kitsap Public Health District Documentation No 9/14/2018 9/18/2018
Energy Code Worksheet No 9/14/2018 9/18/2018
Stormwater Packet No 9/14/2018 9/18/2018
Site Assessment and Planning Packet No 9/20/2018 9/21/2018
Stormwater Pollution Prevention Plan (SWPPP) Drawings No 9/14/2018 9/21/2018
Stormwater Pollution Prevention Plan (SWPPP) Narrative No 9/18/2018 9/18/2018
Simple Infiltration Test Worksheet No 9/24/2018 9/26/2018
Soil Management Plans No 9/20/2018 9/21/2018
Letter of Authorization No 9/14/2018 9/18/2018
Parcel Map Showing Driveways No 9/14/2018 9/18/2018

Approval Steps
Follow your application through the approval process.
Step Status Date
PW - Concurrency Test Review Approved 10/12/2018
Building Height Review Approval Step Not Required (Deleted) 9/18/2018
Health District Approval Processing for Building Permits Approved 9/18/2018
Environmental Review Approved 10/29/2018
Residential Zoning Review Approved 7/29/2019
Stormwater Review Approved 8/2/2019
Building Code Plan Review Approved 7/31/2019
Road Approach Research Approved 10/24/2018
Road Approach Approval Approved 10/24/2018
Addressing, Verification/Assignment Approved 10/24/2018
PW - ROW Review Approval Step Not Required (Deleted) 11/7/2018
Fire Marshal Review Approval Step Not Required (Deleted) 10/25/2018

Reviews
Start Complete Applicant Response
10/23/2018 11/15/2018 7/19/2019
7/19/2019 8/2/2019

Fixtures
Fixture Quantity Per Unit Value
R-Cook Stove with Exhaust, Electric 1 $0.00 $0.00
R-Floor Drain 1 $0.00 $0.00
R-Sink (Lavatory, Kitchen, Mop or Bar Sink) 2 $0.00 $0.00
R-Water Heater 1 $0.00 $0.00
R-Tub and/or Shower Unit 1 $0.00 $0.00
R-Bath Fan and/or Exhaust Fan 1 $0.00 $0.00
R-Hose Bibs 1 $0.00 $0.00
R-Water Closet and/or Urinal 1 $0.00 $0.00
Total: $0.00

Valuations

Valuations and fees will be validated during the review process.

Valuation Quantity Rate Value
New Residential Floor Space, Main (1st) Floor - Enter Square Footage 310.00 $116.15  / SQFT $36,006.50
New covered porch, carport, covered deck - Enter Square Footage 190.00 $23.23  / SQFT $4,413.70
Total: $40,420.20

Fees

Fee totals below may not reflect all fees, including fees calculated by hourly rates.

Fee Amount
School Impact Fee With CPI Modifier $1,335.77
Road Impact Fee With CPI Modifier $722.28
Permit Center Base Fee $90.00
Technology Fee $7.03
State Surcharge DCD $6.50
Park Impact Fee With CPI Modifier $681.90
First Half of Permit Residential Fee $351.66
Second Half of Permit Residential Fee $351.66
Total : $3,546.80

Bonds
Type Number Amount Issued Expires Completed

Inspections

The inspections listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit has been issued, all inspections listed are applicable to your permit. Note: Community Development Building Final Inspections (B-Final), Commercial CO Inspection Fire Marshal (FM-CO-Final) and the Final Field Inspections (DE-FFI) are not eligible for next day inspection requests. Please allow two business days when requesting a Final inspection.

Completed On
Temporary Silt & Erosion Control Inspection
Foundation, Footing Inspection
Footing, Deck or Porch inspection
Foundation, Stem Wall Inspection
Underfloor framing (prior to sub-floor)
Exterior Shear Wall Nailing Inspection
Interior Shear Wall Nailing Inspection
Residential Framing, Deck or Porch inspection
Plumbing, Rough-In Inspection
Mechanical, Ventilation Rough-In Inspection
Ductless Split System
Framing Inspection
Insulation Inspection
Gypsum Wallboard Inspection
Driveway Full Dispersion
Health District Final (Final Must Be Approved Prior To Scheduling Final Building Inspection)
Deferred Impact Fees Must be paid in full before requesting final inspection. Please call 360-337-5777.
Final Building Inspection
Residential Certificate of Occupancy Approval Inspection
Requested permit extension 8/4/2020
Requested permit extension 1/21/2021

Structures
Structure Use Occupancy Type Square Footage
SASAKI - to build a single family home <1,500 sq ft

Conditions

The conditions listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit is issued, all conditions listed are applicable to your permit.

Permit Expiration: Building permits expire 365 days after permit issuance, or 180 days after the last approved inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. Additional fees may be due to reactivate the permit.
ELECTRICAL WORK. If electrical work is proposed, a separate electrical permit is required. You can contact Labor and Industries (L&I) at www.lni.wa.gov to obtain an electrical permit. Electrical systems must be inspected by L&I prior to requesting a framing inspection and final approval granted prior to requesting a final building inspection from the Department of Community Development.
Reinspection Fee: All approved plans for this permit and the printed building permit with conditions are required to be on-site for inspection purposes, and work to be inspected shall be complete and ready for inspection. If an inspection is called for and plans are not available on site, or the work is not ready for inspection, or if previously identified corrections have not been made, approval will not be granted. In addition, a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
Final Inspection Required: All building permits shall have a final inspection performed and approved by the Kitsap County Department of Community Development prior to permit expiration. The failure to request a final inspection or failure to obtain final approval prior to expiration will be documented in the legal property records on file with Kitsap County as being non-compliant with Kitsap County ordinances and building regulations and will be referred to Kitsap County Code Compliance for action.
Certificate of Occupancy Approval Inspection. No building or structure shall be used or occupied, until the final inspection and the occupancy approval inspection have been approved. Approval of the certificate of occupancy inspection shall not be construed as an approval of any violation of the provisions of this code or of other ordinances of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or other ordinances of the jurisdiction shall not be valid.
Residential Address: Numerals for residential building addresses shall be conspicuously displayed on a contrasting background and shall be a minimum of 4 inches in height with a minimum stroke of 1/2 inch. If the building is not clearly visible from a named way of travel, the numerical designation (address) shall also be displayed near the main entrance to the property as well as at the driveway entrance that leads to the building. Property addresses shall be posted prior to requesting any inspections. If property addresses are not posted upon inspection, inspection will not be approved and a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
Erosion and sedimentation control devices shall be installed in accordance with best management practices. Provide silt fence(s) along contours. Provide appropriate gravel construction entrance mat. Protect all exposed soils.
All structures shall have roof gutters. All gutters, downspouts, and yard drains must be directed at a minimum to splash blocks, (or an infiltration system, if required). Drains shall have a minimum 2% grade away from the foundation. All drainage discharges shall be located so that there is no adverse impact to downstream or adjacent properties.
This permit shall comply with all Kitsap Public Health District regulations and conditions of approval.
No final inspection or occupancy approval will be granted until all impact fees are paid. This permit is subject to the payment of impact fees. Impact fees must be paid at time of permit issuance, or if deferred, must be paid prior to final inspection.
Existing approach is acceptable. However, any improvements or installation of another approach on this parcel will require a new road approach permit.
Category III covenant is recorded under AFN#201610240119 for SFR.
This permit shall comply with all of the conditions of approval of the land segregation for SHORT PLAT NO. 2474 RECORDED UNDER AUDITOR'S FILE NO. 8101230078
A Native Vegetation Retention Covenant is required for dispersion of driveway stormwater and rooftop. The document shall be recorded and a copy given to DCD prior to scheduling a final inspection. An 8.5 inch x 11 inch site plan shall be provided with a 1-inch clean border on all sides, showing the entire parcel and identifying native vegetation areas to be retained for a distance 100 feet downslope of the driveway. The site plan shall be recorded with the native vegetation covenant.
A Native Vegetation Retention Covenant is required for dispersion of onsite stormwater. The document must be recorded prior to requesting a final building inspection.
Individual downspout full dispersion.

Required Permits
Type Requirement For Number Status

Notes

Associations