20-04524 Garage/Carport/Shed or Accessory Structure - Residential
Address:
9518 HORIZON LN SE
PORT ORCHARD,  WA  98367
Parcel #: 242301-4-034-2002
Status: Permit has been issued to applicant.
Submitted: 9/28/2020
Approved: 11/19/2020
Issued: 11/19/2020
Closed:
Expires: 11/19/2021
Inspections:
Required: 10
Complete: 8
Total Fees:
$88964
Additional fees may be required
Project: COLE - Detached Garage, No Heat or Plumbing

Public Notice
Description Begin Date End Date

Contacts
:
COLE CLIFFORD R & ANDREA L
:
PRECISE ENGINEERING
:
Clifford Cole

Contractors
CC:
PRO BUILT GARAGES
License #: PROBUBG902OS

Details

Parcels
Parcel(s) associated with your permit.
Parcel Owner Address
242301-4-034-2002 COLE CLIFFORD R & ANDREA L 9518 HORIZON LN SE
PORT ORCHARD,  WA 98367

Submittals

Upload documents in PDF format on the following screen. The name of each file should simply identify what each submittal document is. Examples: “Floor Plans”, “Engineered Structural Plans”, "Engineered Civil Plans", “Site Plan”

Click the files link on the far right of the submittal item to upload. The files link will indicate how many documents have been uploaded.

Not uploading all required submittal documents will delay the processing of your permit.

Submittal Required Received Accepted
Approved Permit Documents and Plans: Print all files and keep onsite for inspections No 11/19/2020 11/19/2020
Information Request: Upload a letter response AND any revised, corrected, or additional documentation. Yes 11/9/2020 11/10/2020
Please Download and Review All Documents: This line contains your detailed information request and when applicable, permit documents with reviewer comments Yes 11/4/2020 11/4/2020
Upload Required Permit Documents as listed on your Required Permit Questionnaire at http://kcowa.us/permitapp No 9/29/2020 10/5/2020

Approval Steps
Follow your application through the approval process.
Step Status Date
Permit Center Processing - Building Approved 10/7/2020
Building Height Review Approval Step Not Required (Deleted) 10/5/2020
Health District Approval Processing for Building Permits Approved 11/10/2020
Environmental Review Approved 11/4/2020
Residential Zoning Review Approved 11/13/2020
Stormwater Review Approved 11/4/2020
Building Code Plan Review Approved 10/12/2020
Road Approach Research Approved 11/12/2020
Fire Marshal Review Approval Step Not Required (Deleted) 10/9/2020
Road Approach Approval Approved 11/19/2020

Reviews
Start Complete Applicant Response
10/5/2020 11/4/2020 11/9/2020
11/9/2020 11/19/2020

Fixtures
Fixture Quantity Per Unit Value
Total: $0.00

Valuations

Valuations and fees will be validated during the review process.

Valuation Quantity Rate Value
New unfinished, heated or unheated space - Enter Square Footage 936.00 $47.28  / SQFT $44,254.08
Total: $44,254.08

Fees

Fee totals below may not reflect all fees, including fees calculated by hourly rates.

Fee Amount
Building Permit Fee, Residential $770.04
Technology Fee $23.10
Permit Center Base Fee $90.00
State Surcharge DCD $6.50
Total : $889.64

Bonds
Type Number Amount Issued Expires Completed

Inspections

The inspections listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit has been issued, all inspections listed are applicable to your permit. Note: Community Development Building Final Inspections (B-Final), Commercial CO Inspection Fire Marshal (FM-CO-Final) and the Final Field Inspections (DE-FFI) are not eligible for next day inspection requests. Please allow two business days when requesting a Final inspection.

Completed On
Pre-issuance inspection for Road Approach. 11/18/2020
Residential Temporary Silt & Erosion Control Inspection.*Note: This is not a standalone inspection, it will be done with all building inspections and will not be approved until final inspection. You will not need to request this inspection unless you're instructed to by your Inspector.
Residential Foundation, Footing Inspection 12/8/2020
Residential Foundation, Stem Wall Inspection 12/8/2020
Residential Exterior Shear Wall Nailing Inspection 1/11/2021
Residential Framing Inspection 1/25/2021
Road approach form inspection prior to pour 1/21/2021
Road Approach - Final 1/21/2021
Health District Final (Final Must Be Approved Prior To Scheduling Final Building Inspection) 11/10/2020
Residential Final Building Inspection

Structures
Structure Use Occupancy Type Square Footage
COLE - Detached Garage, No Heat or Plumbing Residential accessory structure, private garage, carport, deck, shed 936

Conditions

The conditions listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit is issued, all conditions listed are applicable to your permit.

Permit Expiration: Building permits expire 365 days after permit issuance, or 180 days after the last approved inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. Additional fees may be due to reactivate the permit.
ELECTRICAL WORK. If electrical work is proposed, a separate electrical permit is required. You can contact Labor and Industries (L&I) at www.lni.wa.gov to obtain an electrical permit. Electrical systems must be inspected by L&I prior to requesting a framing inspection and final approval granted prior to requesting a final building inspection from the Department of Community Development.
Reinspection Fee: All approved plans for this permit and the printed building permit with conditions are required to be on-site for inspection purposes, and work to be inspected shall be complete and ready for inspection. If an inspection is called for and plans are not available on site, or the work is not ready for inspection, or if previously identified corrections have not been made, approval will not be granted. In addition, a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
Final Inspection Required: All building permits shall have a final inspection performed and approved by the Kitsap County Department of Community Development prior to permit expiration. The failure to request a final inspection or failure to obtain final approval prior to expiration will be documented in the legal property records on file with Kitsap County as being non-compliant with Kitsap County ordinances and building regulations and will be referred to Kitsap County Code Compliance for action.
Group U, non-habitable use only: This structure is limited to Group U occupancy use only (private garages, carports, sheds, and agricultural buildings.) Any other use will be in violation of the Kitsap County Building & Fire Code and Kitsap County Zoning Regulations unless a "Change of Use" permit is applied for, approved, issued and completed.
Unheated Structure: This structure is approved as un-heated space. If at any time this building is to be used for anything other than what it is approved for, a change of use permit shall be applied for, reviewed and approved prior to the change.
Residential Address: Numerals for residential building addresses shall be conspicuously displayed on a contrasting background and shall be a minimum of 4 inches in height with a minimum stroke of 1/2 inch. If the building is not clearly visible from a named way of travel, the numerical designation (address) shall also be displayed near the main entrance to the property as well as at the driveway entrance that leads to the building. Property addresses shall be posted prior to requesting any inspections. If property addresses are not posted upon inspection, inspection will not be approved and a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
Erosion and sedimentation control devices shall be installed in accordance with best management practices. Provide silt fence(s) along contours. Provide appropriate gravel construction entrance mat. Protect all exposed soils.
All structures shall have roof gutters. All gutters, downspouts, and yard drains must be directed at a minimum to splash blocks, (or an infiltration system, if required). Drains shall have a minimum 2% grade away from the foundation. All drainage discharges shall be located so that there is no adverse impact to downstream or adjacent properties.
This permit shall comply with all Kitsap Public Health District regulations and conditions of approval.
Construct per Section (AA) of the Exhibit. Grade approach to drain away from County Roadway to ditch line. Pave approach from existing road to edge of Right of Way/Property line or 13 feet, whichever is greater. Provide culvert pipe with minimum dimensions of 20 feet in length and 12 inches in diameter. All pipe shall be "Schedule A" strength.
This permit shall comply with all of the conditions of approval of the land segregation for PARCEL C SP 4221 RECORDED UNDER AUDITOR NUMBER 8605090145 THAT PORTION OF THE SOUTH HALF OF THE SOUTH HALF OF THE SOUTHWEST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 24, TOWNSHIP 23 NORTH, RANGE 1 EAST, W.M., IN KITSAP COUNTY, WASHINGTON.
This lot is considered an historic lot and may utilize Kitsap County Code (KCC) 17.420.060 footnote 42b. The lot may use that residential zoning classification that most closely corresponds to the dimension or dimensions of record.
Required Minimum Zoning Setbacks- Minimum Front: 20' South Property Line Minimum Side: 5' Minimum Side: 5' Minimum Rear: 10'
New and/or replaced hard surfaces do not exceed the 2,000 square foot threshold; nor does the project exceed 7,000 square feet of disturbed area. While a formal plan is not required, the applicant must consider all elements required of a stormwater pollution prevention plan and make allowances for managing erosion and sediment discharge on site. Per KCC Title 12, if the project exceeds either of the thresholds noted above, then additional review for stormwater management will be required.

Required Permits
Type Requirement For Number Status

Associations