20-05754 Mechanical & Plumbing - Residential
Address:
2095 NW MISTY RIDGE LN
SILVERDALE,  WA  98383
Parcel #: 092501-4-007-2002
Status: Closed Finaled - All work is done on the permit including all inspections and Bonds.
Submitted: 12/8/2020
Approved: 12/9/2020
Issued: 12/9/2020
Closed: 1/21/2021
Expires: 12/9/2021
Inspections:
Required: 2
Complete: 2
Total Fees:
$21115
Additional fees may be required
Project: HERGERT-INSTALLATION OF GAS FURNACE

Public Notice
Description Begin Date End Date

Contacts
:
HERGERT JOHN & JOYCE
:
HERGERT JOHN & JOYCE
:
HOOD CANAL HEATING & COOLING Attn: Alexis Reasons

Contractors
CC:
HOOD CANAL HEATING & COOLING
License #: HOODCCH821O1

Details

Parcels
Parcel(s) associated with your permit.
Parcel Owner Address
092501-4-007-2002 HERGERT JOHN & JOYCE 2095 NW MISTY RIDGE LN
SILVERDALE,  WA 98383

Submittals

Upload documents in PDF format on the following screen. The name of each file should simply identify what each submittal document is. Examples: “Floor Plans”, “Engineered Structural Plans”, "Engineered Civil Plans", “Site Plan”

Click the files link on the far right of the submittal item to upload. The files link will indicate how many documents have been uploaded.

Not uploading all required submittal documents will delay the processing of your permit.

Submittal Required Received Accepted
Upload Required Permit Documents as listed on your Required Permit Questionnaire at http://kcowa.us/permitapp Yes 12/8/2020 12/9/2020

Approval Steps
Follow your application through the approval process.
Step Status Date
Application has been submitted and is pending acceptance Approved 12/9/2020

Reviews
Start Complete Applicant Response

Fixtures
Fixture Quantity Per Unit Value
R-Natural Gas Furnace +/- Ducting 1 $0.00 $0.00
Total: $0.00

Valuations

Valuations and fees will be validated during the review process.

Valuation Quantity Rate Value
Mech/Plumb - Enter cost of fixtures & installation for the project 5867.00 $1.00  / EACH $5,867.00
Total: $5,867.00

Fees

Fee totals below may not reflect all fees, including fees calculated by hourly rates.

Fee Amount
Residential Mechanical and PlumbingFee $205.00
Technology Fee $6.15
Total : $211.15

Bonds
Type Number Amount Issued Expires Completed

Inspections

The inspections listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit has been issued, all inspections listed are applicable to your permit. Note: Community Development Building Final Inspections (B-Final), Commercial CO Inspection Fire Marshal (FM-CO-Final) and the Final Field Inspections (DE-FFI) are not eligible for next day inspection requests. Please allow two business days when requesting a Final inspection.

Completed On
Residential Mechanical, Furnace Rough-In 12/18/2020
Residential Final Building Inspection 1/21/2021

Structures
Structure Use Occupancy Type Square Footage

Conditions

The conditions listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit is issued, all conditions listed are applicable to your permit.

This building permit is for the construction of a project that must satisfy the criteria for over the counter issuance. This building permit is limited to the identified scope and has been approved for issuance based on how the scope was represented to Kitsap County. Approval for issuance of this permit is granted without the benefit of construction document review and without detailed plans and specifications. LIMITED SCOPE OF BUILDING PERMIT. Over the counter building permits are strictly limited to the scope of work as identified within the permit application. No additional work, remodeling or expansion beyond the identified scope is authorized. Any changes in the scope of work will require additional review and/or additional permits. FIELD CORRECTIONS AS REQUIRED: The construction of the permitted project is subject to inspections by the Kitsap County Department of Community Development. Though no review has occurred, it remains imperative that all construction be done in full compliance with Kitsap County Code (KCC), including the Kitsap County Building & Fire Code as adopted in KCC 14.04.040, along with all of the codes adopted by reference therein. Any corrections, changes or alterations required by a Kitsap County Building or Fire Inspector shall be made prior to requesting additional inspections.
Permit Expiration: Building permits expire 365 days after permit issuance, or 180 days after the last approved inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. Additional fees may be due to reactivate the permit.
CARBON MONOXIDE DETECTORS: For existing dwellings (requiring a permit), an approved carbon monoxide detectors shall be installed outside of each separate sleeping area in the immediate vicinity of the bedrooms in dwelling units within which fuel-fire appliances are installed and in dwelling units that have attached garages. IRC R315.2
ELECTRICAL WORK. If electrical work is proposed, a separate electrical permit is required. You can contact Labor and Industries (L&I) at www.lni.wa.gov to obtain an electrical permit. Electrical systems must be inspected by L&I prior to requesting a framing inspection and final approval granted prior to requesting a final building inspection from the Department of Community Development.
Reinspection Fee: All approved plans for this permit and the printed building permit with conditions are required to be on-site for inspection purposes, and work to be inspected shall be complete and ready for inspection. If an inspection is called for and plans are not available on site, or the work is not ready for inspection, or if previously identified corrections have not been made, approval will not be granted. In addition, a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
Final Inspection Required: All building permits shall have a final inspection performed and approved by the Kitsap County Department of Community Development prior to permit expiration. The failure to request a final inspection or failure to obtain final approval prior to expiration will be documented in the legal property records on file with Kitsap County as being non-compliant with Kitsap County ordinances and building regulations and will be referred to Kitsap County Code Compliance for action.

Required Permits
Type Requirement For Number Status

Notes

Associations