Contact
20-02834 Foundation Repair or Replace - Residential
Address:
9781 ENCHANTMENT AVE NW
SILVERDALE,  WA  98383
Parcel #: 5201-000-032-0008
Status: Closed Finaled - All work is done on the permit including all inspections and Bonds.
Submitted: 6/30/2020
Approved: 11/3/2020
Issued: 11/5/2020
Closed: 1/27/2021
Expires: 11/5/2021
Inspections:
Required: 4
Complete: 4
Total Fees:
$36707
Additional fees may be required
Project: WESTON - Voluntary Foundation Underpinning Using 8 Push Piers

Public Notice
Description Begin Date End Date

Contacts
:
WESTON TOBY R & RHONDA D
:
WESTON TOBY R & RHONDA D
:
Stark Foundations
:
TERRAFIRMA FOUNDATION RPR SYSTEMS

Contractors
CC:
TERRAFIRMA FOUNDATION RPR INC
License #: TERRAFR931LH

Details

Parcels
Parcel(s) associated with your permit.
Parcel Owner Address
5201-000-032-0008 WESTON TOBY R & RHONDA D 9781 ENCHANTMENT AVE NW
SILVERDALE,  WA 98383

Submittals

Upload documents in PDF format on the following screen. The name of each file should simply identify what each submittal document is. Examples: “Floor Plans”, “Engineered Structural Plans”, "Engineered Civil Plans", “Site Plan”

Click the files link on the far right of the submittal item to upload. The files link will indicate how many documents have been uploaded.

Not uploading all required submittal documents will delay the processing of your permit.

Submittal Required Received Accepted
Miscellaneous inspection documents Yes 12/22/2020 1/27/2021
Approved Permit Documents and Plans: Print all files and keep onsite for inspections Yes 11/4/2020 11/4/2020
Information Request: Upload a letter response AND any revised, corrected, or additional documentation. Yes 10/21/2020 10/22/2020
Please Download and Review All Documents: This line contains your detailed information request and when applicable, permit documents with reviewer comments Yes 8/10/2020 8/10/2020
Upload Required Permit Documents as listed on your Required Permit Questionnaire at http://kcowa.us/permitapp No 6/30/2020 7/9/2020

Approval Steps
Follow your application through the approval process.
Step Status Date
Permit Center Processing - Building Approved 7/9/2020
Stormwater Review Approved 7/10/2020
Environmental Review Approved 11/3/2020
Building Code Plan Review Approved 10/27/2020

Reviews
Start Complete Applicant Response
7/9/2020 8/10/2020 10/21/2020
10/21/2020 11/3/2020

Fixtures
Fixture Quantity Per Unit Value
Total: $0.00

Valuations

Valuations and fees will be validated during the review process.

Valuation Quantity Rate Value
Bid Price - Enter cost & installation for project 15097.00 $1.00  / Each $15,097.00
Total: $15,097.00

Fees

Fee totals below may not reflect all fees, including fees calculated by hourly rates.

Fee Amount
Permit Center Base Fee $90.00
Building Permit Fee, Residential $262.69
State Surcharge DCD $6.50
Technology Fee $7.88
Total : $367.07

Bonds
Type Number Amount Issued Expires Completed

Inspections

The inspections listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit has been issued, all inspections listed are applicable to your permit. Note: Community Development Building Final Inspections (B-Final), Commercial CO Inspection Fire Marshal (FM-CO-Final) and the Final Field Inspections (DE-FFI) are not eligible for next day inspection requests. Please allow two business days when requesting a Final inspection.

Completed On
Residential Temporary Silt & Erosion Control Inspection.*Note: This is not a standalone inspection, it will be done with all building inspections and will not be approved until final inspection. You will not need to request this inspection unless you're instructed to by your Inspector. 1/21/2021
Residential Foundation, Footing Inspection 12/8/2020
Residential Special Inspection required, to be conducted by 3rd Party, See Permit Conditions 1/21/2021
Residential Final Building Inspection 1/21/2021

Structures
Structure Use Occupancy Type Square Footage
WESTON - Voluntary Foundation Underpinning Using 8 Push Piers

Conditions

The conditions listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit is issued, all conditions listed are applicable to your permit.

Permit Expiration: Building permits expire 365 days after permit issuance, or 180 days after the last approved inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. Additional fees may be due to reactivate the permit.
Reinspection Fee: All approved plans for this permit and the printed building permit with conditions are required to be on-site for inspection purposes, and work to be inspected shall be complete and ready for inspection. If an inspection is called for and plans are not available on site, or the work is not ready for inspection, or if previously identified corrections have not been made, approval will not be granted. In addition, a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
Final Inspection Required: All building permits shall have a final inspection performed and approved by the Kitsap County Department of Community Development prior to permit expiration. The failure to request a final inspection or failure to obtain final approval prior to expiration will be documented in the legal property records on file with Kitsap County as being non-compliant with Kitsap County ordinances and building regulations and will be referred to Kitsap County Code Compliance for action.
Erosion and sedimentation control devices shall be installed in accordance with best management practices. Provide silt fence(s) along contours. Provide appropriate gravel construction entrance mat. Protect all exposed soils.
Special Inspection: 2015 IBC Section 1704. In addition to the inspections required by IBC Section 110, the owner or the engineer or architect of record acting as the owner's agent shall employ one or more special inspectors who shall provide inspections during construction on the types of work listed under IBC Section 1704. The special inspectors' duties & responsibilities shall be as specified in 1703. All special inspection reports shall be provided to the Building Department. Prior to final inspection, the special inspection agency shall also provide a final, signed report to the building department stating that all items requiring special inspection and testing were fulfilled and reported, and, to the best of their knowledge, are in conformance with the approved design drawings, specifications, and applicable provisions of the code. Required special inspections: ((insert inspections here))
This project shall follow the recommendations of the Geotechnical Report by Mud Bay Geotechnical Services, LLC dated 10/12/20. This includes installing push piers to a minimum of 7-feet below the ground surface or minimum psi of 2400, whichever is deeper.

Required Permits
Type Requirement For Number Status

Associations