Contact
19-04652 Single Family Residence - New
Address:
4376 NW WESTGATE RD
SILVERDALE,  WA  98383
Parcel #: 082501-2-051-2002
Status: Permit has been issued to applicant.
Submitted: 10/8/2019
Approved: 3/2/2020
Issued: 3/3/2020
Closed:
Expires: 7/26/2021
Inspections:
Required: 28
Complete: 17
Total Fees:
$10,21928
Additional fees may be required
Project: PALM - New Single Family Residence w/ Attached Garage

Public Notice
Description Begin Date End Date

Contacts
:
Zieser Built Construction Inc
:
PALM KARL R & JENESIS D
:
KITSAP TRIDENT HOMES INC *
:
Jenesis Palm
:
Hodge Engineering Inc.

Contractors
CC:
Zieser Built Construction Inc
License #: ZIESEBC077PR

Details
Impact Fee Land Category: 210
Impact Fee Units: 1

Parcels
Parcel(s) associated with your permit.
Parcel Owner Address
082501-2-051-2002 PALM KARL R & JENESIS D 4376 NW WESTGATE RD
SILVERDALE,  WA 98383

Submittals

Upload documents in PDF format on the following screen. The name of each file should simply identify what each submittal document is. Examples: “Floor Plans”, “Engineered Structural Plans”, "Engineered Civil Plans", “Site Plan”

Click the files link on the far right of the submittal item to upload. The files link will indicate how many documents have been uploaded.

Not uploading all required submittal documents will delay the processing of your permit.

Submittal Required Received Accepted
Approved Permit Documents and Plans: Print all files and keep onsite for inspections Yes 3/2/2020 3/2/2020
Information Request: Upload a letter response AND any revised, corrected, or additional documentation. No 2/25/2020 3/1/2020
Please Download and Review All Documents: This line contains your detailed information request and when applicable, permit documents with reviewer comments No 2/4/2020 2/4/2020
Upload Required Permit Documents as listed on your Required Permit Questionnaire at http://kcowa.us/permitapp No 11/25/2019 11/27/2019

Approval Steps
Follow your application through the approval process.
Step Status Date
Permit Center Processing - Building Approved 12/30/2019
PW - Concurrency Test Review Approved 12/5/2019
Building Height Review Approval Step Not Required (Deleted) 11/13/2019
Health District Approval Processing for Building Permits Approved 11/13/2019
Environmental Review Approved 1/7/2020
Residential Zoning Review Approved 1/21/2020
Stormwater Review Approved 1/31/2020
Building Code Plan Review Approved 3/2/2020
Road Approach Research Approval Step Not Required (Deleted) 12/30/2019
Road Approach Approval Approval Step Not Required (Deleted) 12/30/2019
Addressing, Verification/Assignment Approved 1/22/2020
PW - ROW Review Approval Step Not Required (Deleted) 1/15/2020
Fire Marshal Review Approved 3/2/2020

Reviews
Start Complete Applicant Response
12/30/2019 1/31/2020 2/25/2020
2/25/2020 3/2/2020

Fixtures
Fixture Quantity Per Unit Value
R-Fireplace-Gas, or Gas Log Insert 1 $0.00 $0.00
R-Clothes Dryer with Exhaust, Electric 1 $0.00 $0.00
R-Natural Gas Furnace +/- Ducting 1 $0.00 $0.00
R-Sink (Lavatory, Kitchen, Mop or Bar Sink) 8 $0.00 $0.00
R-Tub and/or Shower Unit 3 $0.00 $0.00
R-Bath Fan and/or Exhaust Fan 5 $0.00 $0.00
R-Hose Bibs 4 $0.00 $0.00
R-Clothes Washing Machine 1 $0.00 $0.00
R-Water Closet and/or Urinal 3 $0.00 $0.00
R-Dish Washer 1 $0.00 $0.00
Heat Pump +/- Ducting 1 $0.00 $0.00
Generator 1 $0.00 $0.00
Water Heater with Heat Pump 1 $0.00 $0.00
R-Cook Stove with Exhaust, LP or Natural Gas 1 $0.00 $0.00
Total: $0.00

Valuations

Valuations and fees will be validated during the review process.

Valuation Quantity Rate Value
New covered porch, carport, covered deck - Enter Square Footage 387.00 $24.15  / SQFT $9,346.05
New Residential Floor Space, Main (1st) Floor - Enter Square Footage 2760.00 $120.75  / SQFT $333,270.00
New unfinished, heated or unheated space - Enter Square Footage 1062.00 $47.09  / SQFT $50,009.58
New unfinished, heated or unheated space - Enter Square Footage 1062.00 $47.09  / SQFT $50,009.58
Total: $442,635.21

Fees

Fee totals below may not reflect all fees, including fees calculated by hourly rates.

Fee Amount
School Impact Fee With CPI Modifier $1,378.52
Technology Fee $72.59
First Half of Permit Residential Fee $3,629.62
Road Impact Fee With CPI Modifier $699.46
State Surcharge DCD $6.50
Permit Center Base Fee $90.00
Park Impact Fee With CPI Modifier $703.72
Blue Address Sign No Postage $9.25
Second Half of Permit Residential Fee $3,629.62
Total : $10,219.28

Bonds
Type Number Amount Issued Expires Completed

Inspections

The inspections listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit has been issued, all inspections listed are applicable to your permit. Note: Community Development Building Final Inspections (B-Final), Commercial CO Inspection Fire Marshal (FM-CO-Final) and the Final Field Inspections (DE-FFI) are not eligible for next day inspection requests. Please allow two business days when requesting a Final inspection.

Completed On
Residential Temporary Silt & Erosion Control Inspection.*Note: This is not a standalone inspection, it will be done with all building inspections and will not be approved until final inspection. You will not need to request this inspection unless you're instructed to by your Inspector.
Residential Foundation, Footing Inspection 6/30/2020
Residential Footing, Deck or Porch inspection 1/27/2021
Residential Foundation, Stem Wall Inspection 7/10/2020
Residential Drainage Inspection - Downspout system (prior to backfill) 7/28/2020
Residential Underfloor framing (prior to sub-floor) 8/6/2020
Residential Exterior Shear Wall Nailing Inspection 10/27/2020
Residential Interior Shear Wall Nailing Inspection 10/27/2020
Residential Plumbing, Rough-In Inspection 11/5/2020
Residential Mechanical, Ventilation Rough-In Inspection 1/21/2021
Residential Mechanical, Interior Gas Piping Inspection 11/5/2020
Residential Mechanical, Furnace Rough-In 1/21/2021
Residential Mechanical, Heat Pump Rough-In Inspection 1/21/2021
Residential Mechanical Fireplace Rough-In Inspection 1/21/2021
Residential Framing, Deck or Porch inspection 1/27/2021
Residential Framing Inspection 1/21/2021
Residential Mechanical, Household Appliance
Residential Insulation Inspection 1/27/2021
Residential Gypsum Wallboard Inspection
Residential Mechanical, Propane or Liquid Fuel Tank & Piping Inspection
Residential Mechanical, Exterior Gas Piping Inspection
Residential Gas Stove Installation Inspection
Infiltration Pit - Stormwater System Inspection 11/5/2020
Soil Management
Deferred Impact Fees Must be paid in full before requesting final inspection. Please call 360-337-5777.
Residential Final Building Inspection
Residential Certificate of Occupancy Approval Inspection
Health District Final (Final Must Be Approved Prior To Scheduling Final Building Inspection)

Structures
Structure Use Occupancy Type Square Footage
PALM - New Single Family Residence w/ Attached Garage Residential, one or two family dwelling / Residential accessory structure, private garage, carport, deck, shed 5271

Conditions

The conditions listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit is issued, all conditions listed are applicable to your permit.

Permit Expiration: Building permits expire 365 days after permit issuance, or 180 days after the last approved inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. Additional fees may be due to reactivate the permit.
ELECTRICAL WORK. If electrical work is proposed, a separate electrical permit is required. You can contact Labor and Industries (L&I) at www.lni.wa.gov to obtain an electrical permit. Electrical systems must be inspected by L&I prior to requesting a framing inspection and final approval granted prior to requesting a final building inspection from the Department of Community Development.
Reinspection Fee: All approved plans for this permit and the printed building permit with conditions are required to be on-site for inspection purposes, and work to be inspected shall be complete and ready for inspection. If an inspection is called for and plans are not available on site, or the work is not ready for inspection, or if previously identified corrections have not been made, approval will not be granted. In addition, a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
Final Inspection Required: All building permits shall have a final inspection performed and approved by the Kitsap County Department of Community Development prior to permit expiration. The failure to request a final inspection or failure to obtain final approval prior to expiration will be documented in the legal property records on file with Kitsap County as being non-compliant with Kitsap County ordinances and building regulations and will be referred to Kitsap County Code Compliance for action.
Certificate of Occupancy Approval Inspection. No building or structure shall be used or occupied, until the final inspection and the occupancy approval inspection have been approved. Approval of the certificate of occupancy inspection shall not be construed as an approval of any violation of the provisions of this code or of other ordinances of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or other ordinances of the jurisdiction shall not be valid.
Residential Address: Numerals for residential building addresses shall be conspicuously displayed on a contrasting background and shall be a minimum of 4 inches in height with a minimum stroke of 1/2 inch. If the building is not clearly visible from a named way of travel, the numerical designation (address) shall also be displayed near the main entrance to the property as well as at the driveway entrance that leads to the building. Property addresses shall be posted prior to requesting any inspections. If property addresses are not posted upon inspection, inspection will not be approved and a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
Erosion and sedimentation control devices shall be installed in accordance with best management practices. Provide silt fence(s) along contours. Provide appropriate gravel construction entrance mat. Protect all exposed soils.
All structures shall have roof gutters. All gutters, downspouts, and yard drains must be directed at a minimum to splash blocks, (or an infiltration system, if required). Drains shall have a minimum 2% grade away from the foundation. All drainage discharges shall be located so that there is no adverse impact to downstream or adjacent properties.
This permit shall comply with all Kitsap Public Health District regulations and conditions of approval.
No final inspection or occupancy approval will be granted until all impact fees are paid. This permit is subject to the payment of impact fees. Impact fees must be paid at time of permit issuance, or if deferred, must be paid prior to final inspection.
Drainage BMP: Infiltration Pit Connect all roof drains to the infiltration trench system as shown on the approved plans. Pit Size: 440 square feet Depth of Pit: 2 feet; Depth of Rock: 1.5 feet Minimum Cover: 6 inches Upslope: Setback 30 feet from drainfield, 10 feet from curtain drain Downslope: Setback 10 feet from drainfield Setback: 10 feet from property line Setback: 10 feet from structures The infiltration pit shall be inspected prior to covering; and shall be completed prior to requesting a final building inspection.
This permit shall comply with all of the conditions of approval of the land segregation for LOT A SHORT PLAT NO 5120 RECORDED UNDER AUDITOR NO 9001290113
Required Minimum Setbacks- Front: West Property Line 50' minimum; 20' minimum No direct access south property line Side:20' minimum Side:20' minimum Rear:n/a
Soil amendment is required for all native vegetation areas disturbed. Applicant shall amend soils for all lawn & landscaped areas with 13 cubic yards of compost amended soil per the approved soil management plan. Amended soils shall be inspected prior to scheduling for final building inspection. Receipts of any purchased top soil shall be made available at the time of inspection.

Required Permits
Type Requirement For Number Status
Right of Way Permit No 20-02420 Finaled

Associations