19-01631 Single Family Residence - Replacement
Address:
6228 ILLAHEE RD NE
BREMERTON,  WA  98311
Parcel #: 312502-1-019-2005
Status: Permit has been issued to applicant.
Submitted: 4/16/2019
Approved: 7/15/2019
Issued: 7/18/2019
Closed:
Expires: 8/27/2021
Inspections:
Required: 25
Complete: 20
Total Fees:
$4,46154
Additional fees may be required
Project: MAKOVICKA - Single Family Residence w/Attached Garage

Public Notice
Description Begin Date End Date

Contacts
:
SCOTT SHELTON w/Ferguson-Cole Inc.
:
MAKOVICKA BETTY J TRUSTEE
:
Forsberg, Rodney
:
Betty Makovicka

Contractors

Details
Impact Fee Units: 1
Impact Fee Land Category: 210

Parcels
Parcel(s) associated with your permit.
Parcel Owner Address
312502-1-019-2005 MAKOVICKA BETTY J TRUSTEE 6228 ILLAHEE RD NE
BREMERTON,  WA 98311

Submittals

Upload documents in PDF format on the following screen. The name of each file should simply identify what each submittal document is. Examples: “Floor Plans”, “Engineered Structural Plans”, "Engineered Civil Plans", “Site Plan”

Click the files link on the far right of the submittal item to upload. The files link will indicate how many documents have been uploaded.

Not uploading all required submittal documents will delay the processing of your permit.

Submittal Required Received Accepted
Approved Permit Documents and Plans: Print all files and keep onsite for inspections Yes 7/18/2019 7/18/2019
Information Request: Upload a letter response AND any revised, corrected, or additional documentation. No 7/1/2019 7/3/2019
Please Download and Review All Documents: This line contains your detailed information request and when applicable, permit documents with reviewer comments No n/a
Upload Required Permit Documents as listed on your Required Permit Questionnaire at http://kcowa.us/permitapp No 4/16/2019 4/26/2019

Approval Steps
Follow your application through the approval process.
Step Status Date
Permit Center Processing - Building Approved 4/26/2019
Building Height Review Approved 7/15/2019
Health District Approval Processing for Building Permits Approved 4/26/2019
Residential Zoning Review Approved 7/5/2019
Environmental Review Approved 7/10/2019
Stormwater Review Approved 5/29/2019
Building Code Plan Review Approved 7/15/2019
Road Approach Research Approval Step Not Required (Deleted) 4/26/2019
Road Approach Approval Approval Step Not Required (Deleted) 4/26/2019
Addressing, Verification/Assignment Approved 4/29/2019
Fire Marshal Review Approval Step Not Required (Deleted) 4/26/2019

Reviews
Start Complete Applicant Response
4/26/2019 5/29/2019 7/1/2019
7/1/2019 7/15/2019

Fixtures
Fixture Quantity Per Unit Value
R-Fireplace-Gas, or Gas Log Insert 1 $0.00 $0.00
R-Clothes Dryer with Exhaust, Electric 1 $0.00 $0.00
R-Gaspipe System LPG/NATL/OIL 1 $0.00 $0.00
R-LP or Natural Gas Water Heater Vent & Combustion Air 1 $0.00 $0.00
R-Propane Furnace +/- Ducting 1 $0.00 $0.00
R-Propane fuel tank 500 gallons and under 1 $0.00 $0.00
R-Sink (Lavatory, Kitchen, Mop or Bar Sink) 4 $0.00 $0.00
R-Tub and/or Shower Unit 2 $0.00 $0.00
R-Bath Fan and/or Exhaust Fan 4 $0.00 $0.00
R-Hose Bibs 2 $0.00 $0.00
R-Clothes Washing Machine 1 $0.00 $0.00
R-Water Closet and/or Urinal 2 $0.00 $0.00
R-Dish Washer 1 $0.00 $0.00
Heat Pump +/- Ducting 1 $0.00 $0.00
R-Cook Stove with Exhaust, LP or Natural Gas 1 $0.00 $0.00
Total: $0.00

Valuations

Valuations and fees will be validated during the review process.

Valuation Quantity Rate Value
New unfinished, heated or unheated space - Enter Square Footage 624.00 $47.09  / SQFT $29,384.16
New covered porch, carport, covered deck - Enter Square Footage 224.00 $24.15  / SQFT $5,409.60
New Residential Floor Space, Main (1st) Floor - Enter Square Footage 1836.00 $120.75  / SQFT $221,697.00
New Deck, Uncovered - Enter Square Footage 448.00 $15.70  / SQFT $7,033.60
Total: $263,524.36

Fees

Fee totals below may not reflect all fees, including fees calculated by hourly rates.

Fee Amount
Technology Fee $43.22
State Surcharge DCD $6.50
Permit Center Base Fee $90.00
First Half of Permit Residential Fee $2,160.91
Second Half of Permit Residential Fee $2,160.91
Total : $4,461.54

Bonds
Type Number Amount Issued Expires Completed

Inspections

The inspections listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit has been issued, all inspections listed are applicable to your permit. Note: Community Development Building Final Inspections (B-Final), Commercial CO Inspection Fire Marshal (FM-CO-Final) and the Final Field Inspections (DE-FFI) are not eligible for next day inspection requests. Please allow two business days when requesting a Final inspection.

Completed On
Residential Temporary Silt & Erosion Control Inspection.*Note: This is not a standalone inspection, it will be done with all building inspections and will not be approved until final inspection. You will not need to request this inspection unless you're instructed to by your Inspector.
Residential Foundation, Footing Inspection 9/18/2019
Residential Footing, Deck or Porch inspection 12/11/2019
Residential Framing, Deck or Porch inspection 5/29/2020
Residential Foundation, Stem Wall Inspection 10/21/2019
Drainage inspection prior to backfill 10/25/2019
Residential Manchester/Illahee Height Survey 3/11/2020
Residential Exterior Shear Wall Nailing Inspection 12/11/2019
Residential Interior Shear Wall Nailing Inspection 12/11/2019
Residential Plumbing, Rough-In Inspection 6/16/2020
Residential Mechanical, Ventilation Rough-In Inspection 6/3/2020
Residential Mechanical, Interior Gas Piping Inspection 3/11/2020
Residential Mechanical, Furnace Inspection 3/11/2020
Residential Mechanical, Heat Pump Rough-In Inspection 3/11/2020
Residential Mechanical Fireplace Rough-In Inspection 6/3/2020
Residential Framing Inspection 6/16/2020
Residential Insulation Inspection 7/17/2020
Residential Gypsum Wallboard Inspection 9/1/2020
Residential Mechanical, Exterior Gas Piping Inspection 3/11/2020
Soil Management
Residential Verify existing home was removed
Residential Final Building Inspection
Residential Certificate of Occupancy Approval Inspection
Health District Final (Final Must Be Approved Prior To Scheduling Final Building Inspection) 11/30/2020
Requested permit extension 2/28/2021

Structures
Structure Use Occupancy Type Square Footage
MAKOVICKA - Single Family Residence w/Attached Garage Residential, one or two family dwelling / Residential accessory structure, private garage, carport, deck, shed 3132

Conditions

The conditions listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit is issued, all conditions listed are applicable to your permit.

Permit Expiration: Building permits expire 365 days after permit issuance, or 180 days after the last approved inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. Additional fees may be due to reactivate the permit.
ELECTRICAL WORK. If electrical work is proposed, a separate electrical permit is required. You can contact Labor and Industries (L&I) at www.lni.wa.gov to obtain an electrical permit. Electrical systems must be inspected by L&I prior to requesting a framing inspection and final approval granted prior to requesting a final building inspection from the Department of Community Development.
Reinspection Fee: All approved plans for this permit and the printed building permit with conditions are required to be on-site for inspection purposes, and work to be inspected shall be complete and ready for inspection. If an inspection is called for and plans are not available on site, or the work is not ready for inspection, or if previously identified corrections have not been made, approval will not be granted. In addition, a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
Final Inspection Required: All building permits shall have a final inspection performed and approved by the Kitsap County Department of Community Development prior to permit expiration. The failure to request a final inspection or failure to obtain final approval prior to expiration will be documented in the legal property records on file with Kitsap County as being non-compliant with Kitsap County ordinances and building regulations and will be referred to Kitsap County Code Compliance for action.
Certificate of Occupancy Approval Inspection. No building or structure shall be used or occupied, until the final inspection and the occupancy approval inspection have been approved. Approval of the certificate of occupancy inspection shall not be construed as an approval of any violation of the provisions of this code or of other ordinances of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or other ordinances of the jurisdiction shall not be valid.
Residential Address: Numerals for residential building addresses shall be conspicuously displayed on a contrasting background and shall be a minimum of 4 inches in height with a minimum stroke of 1/2 inch. If the building is not clearly visible from a named way of travel, the numerical designation (address) shall also be displayed near the main entrance to the property as well as at the driveway entrance that leads to the building. Property addresses shall be posted prior to requesting any inspections. If property addresses are not posted upon inspection, inspection will not be approved and a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
Erosion and sedimentation control devices shall be installed in accordance with best management practices. Provide silt fence(s) along contours. Provide appropriate gravel construction entrance mat. Protect all exposed soils.
All structures shall have roof gutters. All gutters, downspouts, and yard drains must be directed at a minimum to splash blocks, (or an infiltration system, if required). Drains shall have a minimum 2% grade away from the foundation. All drainage discharges shall be located so that there is no adverse impact to downstream or adjacent properties.
The existing dwelling unit must be removed or demolished prior to requesting a final inspection of the residence under this permit. If the structure is going to be demolished, a demolition permit must be applied for, issued, and a final inspection obtained prior to requesting a final inspection of this permit.
This permit shall comply with all Kitsap Public Health District regulations and conditions of approval.
House tightline directed towards roadside ditch. Use energy dissapator or bubble-up on property. Stay outside of county right-of-way.
Soil amendment is required for all native vegetation areas disturbed. Applicant shall amend soils for all lawn & landscaped areas with 12.5 cubic yards of compost amended soil per the approved soil management plan. Amended soils shall be inspected prior to scheduling for final building inspection. Receipts of any purchased top soil shall be made available at the time of inspection.
Project shall follow the recommendations of the Limited Geotechnical Reconnaissance by Resolve Environmental and Geotechnical, Inc., dated 9/10/18. No setbacks or buffers are required, but no surface water runoff shall be allowed to direct discharge onto the slopes.

Required Permits
Type Requirement For Number Status
Right of Way Permit No 20-01156 Issued

Notes

Associations