18-04482 Single Family Residence - New
Address:
7972 EBBERT DR SE
PORT ORCHARD,  WA  98367
Parcel #: 4789-002-007-0206
Status: Permit has been issued to applicant.
Submitted: 9/11/2018
Approved: 12/11/2019
Issued: 12/15/2019
Closed:
Expires: 8/11/2021
Inspections:
Required: 25
Complete: 17
Total Fees:
$9,97589
Additional fees may be required
Project: ALMEIDA - Single Family Residence w/ Attached Garage

Public Notice
Description Begin Date End Date

Contacts
:
ALMEIDA MARK
:
ALMEIDA MARK & LINDA

Contractors

Details
Impact Fee Land Category: 210
Impact Fee Units: 1

Parcels
Parcel(s) associated with your permit.
Parcel Owner Address
4789-002-007-0008 ALMEIDA MARK & LINDA **NO SITUS ADDRESS **
UNKNOWN,  WA 00000
4789-002-007-0206 ALMEIDA MARK & LINDA 5753 SE ALOHA LN
PORT ORCHARD,  WA 98367

Submittals

Upload documents in PDF format on the following screen. The name of each file should simply identify what each submittal document is. Examples: “Floor Plans”, “Engineered Structural Plans”, "Engineered Civil Plans", “Site Plan”

Click the files link on the far right of the submittal item to upload. The files link will indicate how many documents have been uploaded.

Not uploading all required submittal documents will delay the processing of your permit.

Submittal Required Received Accepted
Approved Permit Documents and Plans: Print all files and keep onsite for inspections Yes 12/12/2019 12/12/2019
Fourth Information Request: Upload a letter response AND any revised, corrected, or additional documentation No 12/9/2019 12/11/2019
Please Download and Review All Documents: This line contains your detailed information request and when applicable, permit documents with reviewer comments No 12/6/2019 12/6/2019
Third Information Request: Upload a letter response AND any revised, corrected, or additional documentation No n/a
Second Information Request: Upload a letter response AND any revised, corrected, or additional documentation No 9/16/2019 9/16/2019
Information Request: Upload a letter response AND any revised, corrected, or additional documentation. No 8/12/2019 8/15/2019
Completed Online Permit Form No 9/13/2018 9/14/2018
Site Plans No n/a
Construction Plans No n/a
Engineered construction plans No 9/11/2018 9/18/2018
Engineer's supporting calculations No 9/11/2018 9/18/2018
Energy Code Worksheet No n/a
Stormwater Packet No 9/13/2018 9/19/2018
Site Assessment and Planning Packet No 9/11/2018 9/18/2018
Engineered drainage plans No 12/10/2018 12/14/2018
Stormwater Pollution Prevention Plan (SWPPP) Drawings No n/a
Stormwater Pollution Prevention Plan (SWPPP) Narrative No 9/13/2018 9/18/2018
Parcel Map Showing Driveways No 9/13/2018 9/18/2018

Approval Steps
Follow your application through the approval process.
Step Status Date
PW - Concurrency Test Review Approved 12/21/2018
Building Height Review Approval Step Not Required (Deleted) 9/14/2018
Health District Approval Processing for Building Permits Approved 8/15/2019
Environmental Review Approved 11/26/2019
Residential Zoning Review Approved 8/15/2019
Stormwater Review Approved 12/11/2019
Building Code Plan Review Approved 9/25/2019
Road Approach Research Approved 12/17/2018
Road Approach Approval Approved 1/2/2019
Addressing, Verification/Assignment Approved 12/17/2018
PW - ROW Review Approval Step Not Required (Deleted) 12/24/2018
Fire Marshal Review Approval Step Not Required (Deleted) 12/17/2018

Reviews
Start Complete Applicant Response
12/15/2018 1/11/2019 8/12/2019
8/12/2019 8/23/2019 9/16/2019
9/16/2019 9/25/2019 11/26/2019
11/26/2019 12/6/2019 12/11/2019
12/11/2019 12/11/2019

Fixtures
Fixture Quantity Per Unit Value
R-Fireplace-Gas, or Gas Log Insert 1 $0.00 $0.00
R-Clothes Dryer with Exhaust, Electric 1 $0.00 $0.00
R-Cook Stove with Exhaust, Electric 1 $0.00 $0.00
R-Electric Furnace +/- Ducting 1 $0.00 $0.00
R-Sink (Lavatory, Kitchen, Mop or Bar Sink) 2 $0.00 $0.00
R-Tub and/or Shower Unit 2 $0.00 $0.00
R-Bath Fan and/or Exhaust Fan 3 $0.00 $0.00
R-Hose Bibs 2 $0.00 $0.00
R-Clothes Washing Machine 1 $0.00 $0.00
R-Dish Washer 1 $0.00 $0.00
Heat Pump +/- Ducting 1 $0.00 $0.00
Water Heater with Heat Pump 1 $0.00 $0.00
Total: $0.00

Valuations

Valuations and fees will be validated during the review process.

Valuation Quantity Rate Value
New covered porch, carport, covered deck - Enter Square Footage 392.00 $23.23  / SQFT $9,106.16
New unfinished, heated or unheated space - Enter Square Footage 1029.00 $45.30  / SQFT $46,613.70
New space used for storage only (unheated) - Enter Square Footage 439.00 $45.30  / SQFT $19,886.70
New Residential Floor Space, Main (1st) Floor - Enter Square Footage 2783.00 $116.15  / SQFT $323,245.45
Total: $398,852.01

Fees

Fee totals below may not reflect all fees, including fees calculated by hourly rates.

Fee Amount
School Impact Fee With CPI Modifier $1,335.77
State Surcharge DCD $6.50
Permit Center Base Fee $90.00
Road Impact Fee With CPI Modifier $722.28
Technology Fee $69.40
Park Impact Fee With CPI Modifier $681.90
First Half of Permit Residential Fee $3,470.02
Second Half of Permit Residential Fee $3,470.02
DCD Reinspection $130.00
Total : $9,975.89

Bonds
Type Number Amount Issued Expires Completed

Inspections

The inspections listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit has been issued, all inspections listed are applicable to your permit. Note: Community Development Building Final Inspections (B-Final), Commercial CO Inspection Fire Marshal (FM-CO-Final) and the Final Field Inspections (DE-FFI) are not eligible for next day inspection requests. Please allow two business days when requesting a Final inspection.

Completed On
Pre-issuance inspection for Road Approach. 12/21/2018
Temporary Silt & Erosion Control Inspection
Drainage inspection prior to backfill 8/6/2020
Foundation, Footing Inspection 6/4/2020
Footing, Deck or Porch inspection 11/19/2020
Foundation, Stem Wall Inspection 6/17/2020
Underfloor framing (prior to sub-floor) 9/3/2020
Exterior Shear Wall Nailing Inspection 11/19/2020
Interior Shear Wall Nailing Inspection 1/5/2021
Plumbing, Rough-In Inspection 11/19/2020
Mechanical, Ventilation Rough-In Inspection 1/8/2021
Mechanical, Interior Gas Piping Inspection 1/27/2021
Mechanical, Furnace Inspection 1/27/2021
Mechanical, Heat Pump/Mini-Split 1/27/2021
Mechanical, Free Standing Fireplace/Woodstove 1/27/2021
Framing Inspection 1/28/2021
Insulation Inspection 2/8/2021
Gypsum Wallboard Inspection 2/12/2021
Mechanical, Propane or Liquid Fuel Tank & Piping Inspection
Mechanical, Exterior Gas Piping Inspection
Road approach form inspection prior to pour
Road Approach - Final
Deferred Impact Fees Must be paid in full before requesting final inspection. Please call 360-337-5777.
Final Building Inspection
Residential Certificate of Occupancy Approval Inspection

Structures
Structure Use Occupancy Type Square Footage
ALMEIDA - Single Family Residence w/ Attached Garage Residence Residential, one or two family dwelling / Residential accessory structure, private garage, carport, deck, shed 4643

Conditions

The conditions listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit is issued, all conditions listed are applicable to your permit.

Permit Expiration: Building permits expire 365 days after permit issuance, or 180 days after the last approved inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. Additional fees may be due to reactivate the permit.
ELECTRICAL WORK. If electrical work is proposed, a separate electrical permit is required. You can contact Labor and Industries (L&I) at www.lni.wa.gov to obtain an electrical permit. Electrical systems must be inspected by L&I prior to requesting a framing inspection and final approval granted prior to requesting a final building inspection from the Department of Community Development.
Reinspection Fee: All approved plans for this permit and the printed building permit with conditions are required to be on-site for inspection purposes, and work to be inspected shall be complete and ready for inspection. If an inspection is called for and plans are not available on site, or the work is not ready for inspection, or if previously identified corrections have not been made, approval will not be granted. In addition, a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
Final Inspection Required: All building permits shall have a final inspection performed and approved by the Kitsap County Department of Community Development prior to permit expiration. The failure to request a final inspection or failure to obtain final approval prior to expiration will be documented in the legal property records on file with Kitsap County as being non-compliant with Kitsap County ordinances and building regulations and will be referred to Kitsap County Code Compliance for action.
Certificate of Occupancy Approval Inspection. No building or structure shall be used or occupied, until the final inspection and the occupancy approval inspection have been approved. Approval of the certificate of occupancy inspection shall not be construed as an approval of any violation of the provisions of this code or of other ordinances of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or other ordinances of the jurisdiction shall not be valid.
Residential Address: Numerals for residential building addresses shall be conspicuously displayed on a contrasting background and shall be a minimum of 4 inches in height with a minimum stroke of 1/2 inch. If the building is not clearly visible from a named way of travel, the numerical designation (address) shall also be displayed near the main entrance to the property as well as at the driveway entrance that leads to the building. Property addresses shall be posted prior to requesting any inspections. If property addresses are not posted upon inspection, inspection will not be approved and a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
Erosion and sedimentation control devices shall be installed in accordance with best management practices. Provide silt fence(s) along contours. Provide appropriate gravel construction entrance mat. Protect all exposed soils.
All structures shall have roof gutters. All gutters, downspouts, and yard drains must be directed at a minimum to splash blocks, (or an infiltration system, if required). Drains shall have a minimum 2% grade away from the foundation. All drainage discharges shall be located so that there is no adverse impact to downstream or adjacent properties.
This permit shall comply with all Kitsap Public Health District regulations and conditions of approval.
No final inspection or occupancy approval will be granted until all impact fees are paid. This permit is subject to the payment of impact fees. Impact fees must be paid at time of permit issuance, or if deferred, must be paid prior to final inspection.
Existing approach is acceptable. However, any improvements or installation of another approach on this parcel will require a new road approach permit.
Construct per Section (AA) of the Exhibit. Pave approach from existing road to edge of Right of Way/Property line or 13 feet, whichever is greater. Match existing pipe. Maintain existing grade of driveway.
Construct per Section (AA) of the Exhibit. Grade approach to drain away from County Roadway to ditch line. Pave approach from existing road to edge of Right of Way/Property line or 13 feet, whichever is greater. Provide culvert pipe with minimum dimensions of 20 feet in length and 12 inches in diameter. All pipe shall be "Schedule A" strength.
Construct per Section (AA) of the Exhibit. Grade approach to drain away from County Roadway. Pave approach from existing road to edge of Right of Way/Property line or 13 feet, whichever is greater. No culvert pipe required.
Construct per Section (AA) of the Exhibit. Grade approach to direct water to roadway thickened edge asphalt or curbing. Pave Approach from existing road to edge of Right of Way/Property Line or 13-feet, whichever is greater. No culvert pipe required.
Approach shall be removed and ditch restored to original condition, upon completion of logging. Temporary approach shall be constructed per Section (AA) of the Exhibit. Grade approach to drain away from County road toward ditch line. Provide culvert pipe with minimum dimensions of 20 feet in length and 12 inches in diameter. All pipe shall be "Schedule A" strength.
Construct approach per Section (AA). Grade approach to drain away from roadway. Construct an entry mat of 2 to 4 inch rock for a minimum distance of 100 feet. If needed, provide a culvert 20 feet in length and 12 inches in diameter. All pipe shall be “Schedule A” strength. Entire approach shall be removed at the end of six months and the ditch restored to original condition.
A 6-foot minimum clearance from all existing culverts must be maintained. All work must be consistent with existing stormwater and/or road approach ordinances. Comply with Section A-A of Figure 4-1 of KC Road Standards. If this work will cause road closures or detours, you must file a traffic plan with Kitsap County Public Works including specific dates and durations of such action. All culvert pipes must meet WSDOT Schedule "A" specifications. Asphalt/concrete from edge of existing road surface to the property line or 13 feet, whichever is greater. This permit is issued for access connection only; additional permits are required for road construction, utilities and infrastructure construction.
Drainage mitigation method: Site Development Activity Permit (SDAP) All site plan construction and stormwater systems shall be installed as designed per associated SDAP Stormwater mitigation that does not match the approved SDAP will not be allowed without further SDAP review by Kitsap County Department of Community Development
This permit shall comply with all of the conditions of approval of the land segregation for THE EAST ONE HALF OF LOT 7 AND THE EAST ONE HALF OF LOT 8, BLOCK 2, LONG LAKE FIVE ACRE TRACTS, AS RECORDED IN VOLUME 3 OF PLATS, PAGE 21, RECORDS OF KITSAP COUNTY, WASHINGTON.
The final site inspection for the Timber Harvest Permit (permit number 17-04354), for after timber thinning will need to be scheduled to verify compliance with the permit conditions prior to the building permit final.
Prior to approval of final inspection, it must be demonstrated to the inspector through the load ticket (provided by the logger) that the timber harvest was under 5,000 board feet. If the harvest was over 5,000 board feet, the income must be reported the Washington State Department of Revenue at DORDLFTPermits@DOR.WA.GOV . Proof of reporting must be demonstrated to the inspector (copy of email, etc.) prior to final inspection approval.

Required Permits
Type Requirement For Number Status
Site Development Activity Permit - Single Family Residence Issue 19-00948 Issued

Notes

Associations