Contact
20-00723 Single Family Residence - Replacement
Address:
13238 HADFIELD RD SE
OLALLA,  WA  98359
Parcel #: 062202-2-064-2001
Status: Permit has been issued to applicant.
Submitted: 2/19/2020
Approved: 4/24/2020
Issued: 6/5/2020
Closed:
Expires: 8/25/2021
Inspections:
Required: 27
Complete: 10
Total Fees:
$4,81862
Additional fees may be required
Project: EBERT - Single Family Residence w/Attached Garage

Public Notice
Description Begin Date End Date

Contacts
:
EBERT DENNIS
:
WNEK ENGINEERING ATTN: MICHAEL WNEK *
:
Ed Dent with COVAL HOMES LLC
:
GO Feasibility & Permitting LLC
:
Beyler Consulting
:
Karen Ebert
:
Coval Homes

Contractors
CC:
COVAL HOMES LLC
License #: COVALHL894QD

Details
Impact Fee Units:
Impact Fee Land Category:

Parcels
Parcel(s) associated with your permit.
Parcel Owner Address
062202-2-064-2001 EBERT DENNIS 13238 HADFIELD RD SE
OLALLA,  WA 98359

Submittals

Upload documents in PDF format on the following screen. The name of each file should simply identify what each submittal document is. Examples: “Floor Plans”, “Engineered Structural Plans”, "Engineered Civil Plans", “Site Plan”

Click the files link on the far right of the submittal item to upload. The files link will indicate how many documents have been uploaded.

Not uploading all required submittal documents will delay the processing of your permit.

Submittal Required Received Accepted
Approved Permit Documents and Plans: Print all files and keep onsite for inspections Yes 4/24/2020 4/24/2020
Upload Required Permit Documents as listed on your Required Permit Questionnaire at http://kcowa.us/permitapp No 3/11/2020 3/23/2020

Approval Steps
Follow your application through the approval process.
Step Status Date
Permit Center Processing - Building Approved 4/2/2020
PW - Concurrency Test Review Approved 3/24/2020
Building Height Review Approval Step Not Required (Deleted) 3/23/2020
Health District Approval Processing for Building Permits Approved 3/23/2020
Environmental Review Approved 4/2/2020
Residential Zoning Review Approved 4/9/2020
Stormwater Review Approved 4/2/2020
Building Code Plan Review Approved 4/2/2020
Road Approach Research Approval Step Not Required (Deleted) 4/2/2020
Road Approach Approval Approval Step Not Required (Deleted) 4/2/2020
Addressing, Verification/Assignment Approved 4/2/2020
PW - ROW Review Approval Step Not Required (Deleted) 4/24/2020
Fire Marshal Review Approval Step Not Required (Deleted) 4/2/2020

Reviews
Start Complete Applicant Response
4/1/2020 4/24/2020

Fixtures
Fixture Quantity Per Unit Value
R-Gaspipe System LPG/NATL/OIL 1 $0.00 $0.00
R-LP or Natural Gas Water Heater Vent & Combustion Air 1 $0.00 $0.00
R-Propane Furnace +/- Ducting 1 $0.00 $0.00
R-Propane fuel tank 500 gallons and under 1 $0.00 $0.00
R-Sink (Lavatory, Kitchen, Mop or Bar Sink) 4 $0.00 $0.00
R-Water Heater 1 $0.00 $0.00
R-Tub and/or Shower Unit 2 $0.00 $0.00
R-Bath Fan and/or Exhaust Fan 3 $0.00 $0.00
R-Clothes Washing Machine 1 $0.00 $0.00
R-Water Closet and/or Urinal 2 $0.00 $0.00
R-Dish Washer 1 $0.00 $0.00
Heat Pump +/- Ducting 1 $0.00 $0.00
R-Cook Stove with Exhaust, LP or Natural Gas 1 $0.00 $0.00
R-Clothes Dryer with Exhaust, LP or Natural Gas 1 $0.00 $0.00
Total: $0.00

Valuations

Valuations and fees will be validated during the review process.

Valuation Quantity Rate Value
New covered porch, carport, covered deck - Enter Square Footage 308.00 $24.25  / SQFT $7,469.00
New Residential Floor Space, Main (1st) Floor - Enter Square Footage 1848.00 $121.24  / SQFT $224,051.52
New unfinished, heated or unheated space - Enter Square Footage 676.00 $47.28  / SQFT $31,961.28
Total: $263,481.80

Fees

Fee totals below may not reflect all fees, including fees calculated by hourly rates.

Fee Amount
State Surcharge DCD $6.50
Permit Center Base Fee $90.00
Technology Fee $137.54
First Half of Permit Residential Fee $2,292.29
Second Half of Permit Residential Fee $2,292.29
Total : $4,818.62

Bonds
Type Number Amount Issued Expires Completed

Inspections

The inspections listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit has been issued, all inspections listed are applicable to your permit. Note: Community Development Building Final Inspections (B-Final), Commercial CO Inspection Fire Marshal (FM-CO-Final) and the Final Field Inspections (DE-FFI) are not eligible for next day inspection requests. Please allow two business days when requesting a Final inspection.

Completed On
Residential Temporary Silt & Erosion Control Inspection.*Note: This is not a standalone inspection, it will be done with all building inspections and will not be approved until final inspection. You will not need to request this inspection unless you're instructed to by your Inspector.
Residential Foundation, Footing Inspection 11/9/2020
Residential Footing, Deck or Porch inspection 11/13/2020
Residential Framing, Deck or Porch inspection
Residential Foundation, Stem Wall Inspection 11/13/2020
Residential Underfloor framing (prior to sub-floor) 1/21/2021
Residential Exterior Shear Wall Nailing Inspection 2/10/2021
Residential Interior Shear Wall Nailing Inspection 2/10/2021
Residential Plumbing, Rough-In Inspection 2/10/2021
Residential Mechanical, Ventilation Rough-In Inspection 2/26/2021
Residential Mechanical, Interior Gas Piping Inspection 2/26/2021
Residential Mechanical, Furnace Rough-In 2/26/2021
Residential Mechanical Fireplace Rough-In Inspection
Residential Framing Inspection
Residential Mechanical, Household Appliance
Residential Insulation Inspection
Residential Gypsum Wallboard Inspection
Residential Mechanical, Propane or Liquid Fuel Tank & Piping Inspection
Residential Mechanical, Exterior Gas Piping Inspection
Residential Gas Dryer Installation Inspection
Residential Gas Stove Installation Inspection
Health District Final (Final Must Be Approved Prior To Scheduling Final Building Inspection)
Soil Management
Residential Final Building Inspection
Residential Certificate of Occupancy Approval Inspection
Residential Verify existing home was removed
Deferred Impact Fees Must be paid in full before requesting final inspection. Please call 360-337-5777.

Structures
Structure Use Occupancy Type Square Footage
EBERT - Single Family Residence w/Attached Garage Commercial Residential, single family dwelling / Residential accessory structure, private garage, carport, deck, shed 2832

Conditions

The conditions listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit is issued, all conditions listed are applicable to your permit.

Permit Expiration: Building permits expire 365 days after permit issuance, or 180 days after the last approved inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. Additional fees may be due to reactivate the permit.
ELECTRICAL WORK. If electrical work is proposed, a separate electrical permit is required. You can contact Labor and Industries (L&I) at www.lni.wa.gov to obtain an electrical permit. Electrical systems must be inspected by L&I prior to requesting a framing inspection and final approval granted prior to requesting a final building inspection from the Department of Community Development.
Reinspection Fee: All approved plans for this permit and the printed building permit with conditions are required to be on-site for inspection purposes, and work to be inspected shall be complete and ready for inspection. If an inspection is called for and plans are not available on site, or the work is not ready for inspection, or if previously identified corrections have not been made, approval will not be granted. In addition, a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
Final Inspection Required: All building permits shall have a final inspection performed and approved by the Kitsap County Department of Community Development prior to permit expiration. The failure to request a final inspection or failure to obtain final approval prior to expiration will be documented in the legal property records on file with Kitsap County as being non-compliant with Kitsap County ordinances and building regulations and will be referred to Kitsap County Code Compliance for action.
Certificate of Occupancy Approval Inspection. No building or structure shall be used or occupied, until the final inspection and the occupancy approval inspection have been approved. Approval of the certificate of occupancy inspection shall not be construed as an approval of any violation of the provisions of this code or of other ordinances of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or other ordinances of the jurisdiction shall not be valid.
Residential Address: Numerals for residential building addresses shall be conspicuously displayed on a contrasting background and shall be a minimum of 4 inches in height with a minimum stroke of 1/2 inch. If the building is not clearly visible from a named way of travel, the numerical designation (address) shall also be displayed near the main entrance to the property as well as at the driveway entrance that leads to the building. Property addresses shall be posted prior to requesting any inspections. If property addresses are not posted upon inspection, inspection will not be approved and a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
Erosion and sedimentation control devices shall be installed in accordance with best management practices. Provide silt fence(s) along contours. Provide appropriate gravel construction entrance mat. Protect all exposed soils.
All structures shall have roof gutters. All gutters, downspouts, and yard drains must be directed at a minimum to splash blocks, (or an infiltration system, if required). Drains shall have a minimum 2% grade away from the foundation. All drainage discharges shall be located so that there is no adverse impact to downstream or adjacent properties.
This permit shall comply with all Kitsap Public Health District regulations and conditions of approval.
No final inspection or occupancy approval will be granted until all impact fees are paid. This permit is subject to the payment of impact fees. Impact fees must be paid at time of permit issuance, or if deferred, must be paid prior to final inspection.
The existing dwelling unit must be removed or demolished prior to requesting a final inspection of the residence under this permit. If the structure is going to be demolished, a demolition permit must be applied for, issued, and a final inspection obtained prior to requesting a final inspection of this permit.
Downspout dispersion allowed for this project.
Prior to requesting a final building permit inspection, the applicant shall verify that all disturbed areas have been amended with 84 cubic yards of suitable onsite soil per the approved soil management plan.
This permit shall comply with all of the conditions of approval of the land segregation for LOT A, SHORT PLAT NO. 6449, RECORDED IN VOLUME 10 OF SHORT PLATS, PAGES 154 THROUGH 156, UNDER AUDITOR'S FILE NOS. 9403030285 AND 9403030288, BEING A PORTION OF LOT B, SHORT PLAT NO. 1292, RECORDED UNDER AUDITOR'S FILE NO. 7711080157, BEING A PORTION OF THE NORTHWEST QUARTER OF THE NORTHWEST QUARTER, SECTION 6, TOWNSHIP 22 NORTH, RANGE 2 EAST, W.M.; SUBJECT TO AND TOGETHER WITH EASEMENTS AS DEPICTED ON SAID SHORT PLAT.
Required Minimum Zoning Setbacks- Minimum Front: 50' South Property Line Minimum Side: 25' Minimum Side: 25' Minimum Rear: 25'

Required Permits
Type Requirement For Number Status
Demolition and/or Removal of Structure - Residential Close

Associations