Contact
20-03436 Remodel Major - Residential
Address:
8582 LONG LAKE RD SE
PORT ORCHARD,  WA  98367
Parcel #: 202302-2-007-2002
Status: Permit has been issued to applicant.
Submitted: 8/3/2020
Approved: 10/5/2020
Issued: 10/6/2020
Closed:
Expires: 10/6/2021
Inspections:
Required: 12
Complete: 7
Total Fees:
$2,30098
Additional fees may be required
Project: SAMPLE - Interior remodel to include master bed/bath/closet addition in existing attached garage, relocation of interior stair, kitchen remodel, and new shared bath on main level. No exterior work except infill of existing openings and new openings

Public Notice
Description Begin Date End Date

Contacts
:
TERRY A NETTLES
:
SAMPLE NICOLAS A & BRECKLYNN L
:
Massee, Gretchen
:
Nicolas Sample

Contractors
CC:
By the Book Services LLC
License #: BOOKSBS851O8

Details

Parcels
Parcel(s) associated with your permit.
Parcel Owner Address
202302-2-007-2002 SAMPLE NICOLAS A & BRECKLYNN L 8582 LONG LAKE RD SE
PORT ORCHARD,  WA 98367

Submittals

Upload documents in PDF format on the following screen. The name of each file should simply identify what each submittal document is. Examples: “Floor Plans”, “Engineered Structural Plans”, "Engineered Civil Plans", “Site Plan”

Click the files link on the far right of the submittal item to upload. The files link will indicate how many documents have been uploaded.

Not uploading all required submittal documents will delay the processing of your permit.

Submittal Required Received Accepted
Approved Permit Documents and Plans: Print all files and keep onsite for inspections Yes 10/6/2020 10/6/2020
Information Request: Upload a letter response AND any revised, corrected, or additional documentation. Yes 9/22/2020 9/24/2020
Please Download and Review All Documents: This line contains your detailed information request and when applicable, permit documents with reviewer comments Yes 9/16/2020 9/16/2020
Upload Required Permit Documents as listed on your Required Permit Questionnaire at http://kcowa.us/permitapp No 8/3/2020 8/17/2020

Approval Steps
Follow your application through the approval process.
Step Status Date
Permit Center Processing - Building Approved 8/18/2020
Health District Approval Processing for Building Permits Approval Step Not Required (Deleted) 8/16/2020
Environmental Review Approved 9/15/2020
Residential Zoning Review Approved 8/24/2020
Building Code Plan Review Approved 10/5/2020

Reviews
Start Complete Applicant Response
8/18/2020 9/15/2020 9/22/2020
9/22/2020 10/5/2020

Fixtures
Fixture Quantity Per Unit Value
R-Clothes Dryer with Exhaust, Electric 1 $0.00 $0.00
R-Cook Stove with Exhaust, Electric 1 $0.00 $0.00
R-Electric Furnace +/- Ducting 1 $0.00 $0.00
R-Sink (Lavatory, Kitchen, Mop or Bar Sink) 5 $0.00 $0.00
R-Water Heater 1 $0.00 $0.00
R-Tub and/or Shower Unit 3 $0.00 $0.00
R-Bath Fan and/or Exhaust Fan 3 $0.00 $0.00
R-Clothes Washing Machine 1 $0.00 $0.00
R-Water Closet and/or Urinal 2 $0.00 $0.00
R-Dish Washer 1 $0.00 $0.00
Total: $0.00

Valuations

Valuations and fees will be validated during the review process.

Valuation Quantity Rate Value
Major remodel to residential space - Enter Square Footage 1691.00 $72.74  / SQFT $123,003.34
Total: $123,003.34

Fees

Fee totals below may not reflect all fees, including fees calculated by hourly rates.

Fee Amount
Building Permit Fee, Residential $2,140.27
Permit Center Base Fee $90.00
Technology Fee $64.21
State Surcharge DCD $6.50
Total : $2,300.98

Bonds
Type Number Amount Issued Expires Completed

Inspections

The inspections listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit has been issued, all inspections listed are applicable to your permit. Note: Community Development Building Final Inspections (B-Final), Commercial CO Inspection Fire Marshal (FM-CO-Final) and the Final Field Inspections (DE-FFI) are not eligible for next day inspection requests. Please allow two business days when requesting a Final inspection.

Completed On
Residential Temporary Silt & Erosion Control Inspection.*Note: This is not a standalone inspection, it will be done with all building inspections and will not be approved until final inspection. You will not need to request this inspection unless you're instructed to by your Inspector.
Residential Exterior Shear Wall Nailing Inspection 1/25/2021
Residential Interior Shear Wall Nailing Inspection 1/25/2021
Residential Underfloor framing (prior to sub-floor) 3/1/2021
Residential Plumbing, Rough-In Inspection 2/19/2021
Residential Mechanical, Ventilation Rough-In Inspection 3/1/2021
Residential Mechanical, Furnace Rough-In 3/1/2021
Residential Mechanical, Heat Pump Rough-In Inspection 1/21/2021
Residential Framing Inspection
Residential Insulation Inspection
Residential Gypsum Wallboard Inspection
Residential Final Building Inspection

Structures
Structure Use Occupancy Type Square Footage
SAMPLE - Interior remodel to include master bed/bath/closet addition in existing attached garage, relocation of interior stair, kitchen remodel, and new shared bath on main level. No exterior work except infill of existing openings and new openings Residential, one or two family dwelling / Residential accessory structure, private garage, carport, deck, shed 2800

Conditions

The conditions listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit is issued, all conditions listed are applicable to your permit.

Permit Expiration: Building permits expire 365 days after permit issuance, or 180 days after the last approved inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. Additional fees may be due to reactivate the permit.
ELECTRICAL WORK. If electrical work is proposed, a separate electrical permit is required. You can contact Labor and Industries (L&I) at www.lni.wa.gov to obtain an electrical permit. Electrical systems must be inspected by L&I prior to requesting a framing inspection and final approval granted prior to requesting a final building inspection from the Department of Community Development.
Reinspection Fee: All approved plans for this permit and the printed building permit with conditions are required to be on-site for inspection purposes, and work to be inspected shall be complete and ready for inspection. If an inspection is called for and plans are not available on site, or the work is not ready for inspection, or if previously identified corrections have not been made, approval will not be granted. In addition, a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
Final Inspection Required: All building permits shall have a final inspection performed and approved by the Kitsap County Department of Community Development prior to permit expiration. The failure to request a final inspection or failure to obtain final approval prior to expiration will be documented in the legal property records on file with Kitsap County as being non-compliant with Kitsap County ordinances and building regulations and will be referred to Kitsap County Code Compliance for action.
Demolition: All demolition debris shall be properly transported to, and disposed of within an approved solid waste facility. The property shall be left in a clean, safe condition, protected from erosion. Copies of disposal receipts from a regulated disposal or recycling facility shall be provided via the online citizen portal to the Department of Community Development before the final inspection. Any demolition work that does not remove the entire structure, shall be performed such that no structural member remains undermined or left in any position or situation that could cause harm to any person or property. Partial demolition shall not cause any portion of a building to become unsafe. For information regarding asbestos removal or lead abatement, contact Puget Sound Clean Air Agency at (206) 343-8800. All asbestos and hazardous material removal shall comply with all requirements of the Puget Sound Clean Air Agency (PSCAA). Copies of documents submitted to PSCAA shall be forwarded to the Department of Community Development before requesting the final inspection.
This permit shall comply with all Kitsap Public Health District regulations and conditions of approval.

Required Permits
Type Requirement For Number Status

Associations