Contact
19-05911 Miscellaneous Construction or Building - Commercial
Address:
3650 NW ANDERSON HILL RD
SILVERDALE,  WA  98383
Parcel #: 172501-4-104-2004
Status: Reviewing revisions submitted by applicant after permit issuance.
Submitted: 12/24/2019
Approved: 8/6/2020
Issued: 8/20/2020
Closed:
Expires: 8/22/2021
Inspections:
Required: 24
Complete: 2
Total Fees:
$44,48695
Additional fees may be required
Project: CENTRAL KITSAP HS JR HIGH - 900 Building Renovation

Public Notice
Description Begin Date End Date

Contacts
:
Reid Middleton Engineering
:
CENTRAL KITSAP HS JR HIGH & ADMINISTRATION
:
CENTRAL KITSAP HS JR HIGH & ADMINISTRATION
:
Bassen, Veronica
:
Central Kitsap School District
:
Vail, Mark
:
Rice Fergus Miller
:
Brandon Haskins
:
Pease and Sons

Contractors
CC:
PEASE / SONS INC
License #: PEASES*302P0

Details
Impact Fee Land Category:
Impact Fee Units:

Parcels
Parcel(s) associated with your permit.
Parcel Owner Address
172501-4-104-2004 CENTRAL KITSAP HS JR HIGH & ADMINISTRATION 10332 FRONTIER PL NW
SILVERDALE,  WA 98383

Submittals

Upload documents in PDF format on the following screen. The name of each file should simply identify what each submittal document is. Examples: “Floor Plans”, “Engineered Structural Plans”, "Engineered Civil Plans", “Site Plan”

Click the files link on the far right of the submittal item to upload. The files link will indicate how many documents have been uploaded.

Not uploading all required submittal documents will delay the processing of your permit.

Submittal Required Received Accepted
Approved Permit Documents and Plans: Print all files and keep onsite for inspections Yes 8/6/2020 8/6/2020
Third Information Request: Upload a letter response AND any revised, corrected, or additional documentation Yes 8/5/2020 8/6/2020
Please Download and Review All Documents: This line contains your detailed information request and when applicable, permit documents with reviewer comments No 6/30/2020 6/30/2020
Second Information Request: Upload a letter response AND any revised, corrected, or additional documentation No 6/11/2020 6/18/2020
Information Request: Upload a letter response AND any revised, corrected, or additional documentation. No 4/14/2020 4/20/2020
Upload Required Permit Documents as listed on your Required Permit Questionnaire at http://kcowa.us/permitapp No 1/10/2020 1/28/2020

Approval Steps
Follow your application through the approval process.
Step Status Date
Application has been submitted and is pending acceptance Approved 1/28/2020
Permit Center Processing - Building Approved 2/6/2020
PW - Concurrency Test Review Approved 2/25/2020
Impact Fee Review Approval Step Not Required (Deleted) 2/28/2020
Health District Approval Processing for Building Permits Approval Step Not Required (Deleted) 1/7/2020
Environmental Review Approved 5/19/2020
Review for compliance with non-motorized access requirements Approved 2/25/2020
Planning/Zoning Compliance Review Approved 5/11/2020
Stormwater Review Approved 8/6/2020
Building Code Plan Review Approved 6/23/2020
Fire Marshal Review Approved 5/14/2020
Road Approach Research Approval Step Not Required (Deleted) 2/7/2020
Road Approach Approval Approval Step Not Required (Deleted) 2/7/2020
Public Works Sewer Division Approved per Public Works 3/4/2020
Addressing, Verification/Assignment Approved 3/3/2020
PW - ROW Review Approved 6/11/2020

Reviews
Start Complete Applicant Response
2/6/2020 3/4/2020 4/14/2020
4/14/2020 6/11/2020 6/11/2020
6/11/2020 6/30/2020 8/5/2020
8/5/2020 8/6/2020

Fixtures
Fixture Quantity Per Unit Value
C-Air-Handling Unit < 10,000 CFM 28 $0.00 $0.00
C-Ducting Change without New Furnace 1 $0.00 $0.00
C-Bath Fan and/or Exhaust Fan 1 $0.00 $0.00
C-Gaspipe System LPG/NATL/OIL (first 4 outlets) 1 $0.00 $0.00
C-Gas Water Heater Vent & Combustion Air 1 $0.00 $0.00
Toilet/Water Closet/Biddet/Urinal 18 $0.00 $0.00
C-Floor Sink and/or Indirect Waste 1 $0.00 $0.00
C-Grease Interceptor 1 $0.00 $0.00
C-Water Pipe Repair and/or Alteration 1 $0.00 $0.00
C-Industrial/Sand Oil Interceptor 1 $0.00 $0.00
C-Drainage Pipe or Vent Pipe Repair or Alteration 3 $0.00 $0.00
C-Commercial Water Heater 1 $0.00 $0.00
C-Sink (Lavatory, Kitchen, Mop, or Bar Sink) 21 $0.00 $0.00
C-Commercial Hose Bibbs, each 2 $0.00 $0.00
C-Commercial Floor Drain 6 $0.00 $0.00
C-Clothes Washing Machine 1 $0.00 $0.00
C-Drinking Fountain 1 $0.00 $0.00
C-Backflow protective device 2 inches or less 2 $0.00 $0.00
C-ROOFTOP HVAC UNIT 3 $0.00 $0.00
C-Cook Stove with Exhaust, Electric 1 $0.00 $0.00
C-Oven, Electrical 1 $0.00 $0.00
Total: $0.00

Valuations

Valuations and fees will be validated during the review process.

Valuation Quantity Rate Value
B Business (Office) - Type III-B - Enter Square Footage 14211.00 $153.13  / SQFT $2,176,130.43
A-3 Assembly, General, Community Hall, Library, Museum - Type III-B - Enter Square Footage 12980.00 $146.63  / SQFT $1,903,257.40
S-1 Storage, Moderate Hazard - Type III-B - Enter Square Footage 3118.00 $77.33  / SQFT $241,114.94
Total: $4,320,502.77

Fees

Fee totals below may not reflect all fees, including fees calculated by hourly rates.

Fee Amount
Permit Center Base Fee $90.00
State Surcharge Commercial $25.00
Technology Fee $1,036.92
Certificate of Occupancy $130.00
Building Permit Fee, Commercial (all except TI) $43,205.03
Total : $44,486.95

Bonds
Type Number Amount Issued Expires Completed

Inspections

The inspections listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit has been issued, all inspections listed are applicable to your permit. Note: Community Development Building Final Inspections (B-Final), Commercial CO Inspection Fire Marshal (FM-CO-Final) and the Final Field Inspections (DE-FFI) are not eligible for next day inspection requests. Please allow two business days when requesting a Final inspection.

Completed On
Commercial Temporary Silt & Erosion Control. ----------- Note: This is not a standalone inspection, it will be done with all building inspections and will not be approved until final inspection. You will not need to request this inspection unless you're instructed to by your Inspector.
Commercial Foundation, Footing Inspection
Commercial Foundation, Stem Wall Inspection
Commercial Plumbing, Underground Piping Inspection
Commercial Foundation, Slab Inspection 2/23/2021
Commercial Underfloor framing (prior to sub-floor) 2/23/2021
Commercial Exterior Shear Wall Nailing Inspection
Commercial Interior Shear Wall Nailing Inspection
Commercial Mechanical, Ventilation Rough-In Inspection
Commercial Plumbing, Rough-In Inspection
Commercial Masonry Inspection
Commercial Framing Inspection
Commercial Insulation Inspection
Commercial Gypsum Wallboard Inspection
Commercial Fire Rated Shaft Inspection
Commercial Mechanical, Roof-top Unit
Inspect site for compliance with land use conditions
PW Sewer Inspection
Landscape Inspection
Final Field Inspection
Commerical Special Inspection required, to be conducted by 3rd Party, See Permit Conditions
Health District Final (Final Must Be Approved Prior To Scheduling Final Building Inspection)
Commercial Final Building Inspection
Commercial CO Inspection Fire Marshal

Structures
Structure Use Occupancy Type Square Footage
CENTRAL KITSAP HS JR HIGH - 900 Building Renovation Kitsap Library/District Offices

Conditions

The conditions listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit is issued, all conditions listed are applicable to your permit.

Permit Expiration: Building permits expire 365 days after permit issuance, or 180 days after the last approved inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. Additional fees may be due to reactivate the permit.
ELECTRICAL WORK. If electrical work is proposed, a separate electrical permit is required. You can contact Labor and Industries (L&I) at www.lni.wa.gov to obtain an electrical permit. Electrical systems must be inspected by L&I prior to requesting a framing inspection and final approval granted prior to requesting a final building inspection from the Department of Community Development.
Reinspection Fee: All approved plans for this permit and the printed building permit with conditions are required to be on-site for inspection purposes, and work to be inspected shall be complete and ready for inspection. If an inspection is called for and plans are not available on site, or the work is not ready for inspection, or if previously identified corrections have not been made, approval will not be granted. In addition, a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
Final Inspection Required: All building permits shall have a final inspection performed and approved by the Kitsap County Department of Community Development prior to permit expiration. The failure to request a final inspection or failure to obtain final approval prior to expiration will be documented in the legal property records on file with Kitsap County as being non-compliant with Kitsap County ordinances and building regulations and will be referred to Kitsap County Code Compliance for action.
Certificate of Occupancy. All buildings require a certificate of occupancy. No building or structure shall be used or occupied, until a final inspection has been approved and a certificate of occupancy issued. Issuance of a certificate of occupancy shall not be construed as an approval of any violation of the provisions of this code or of other ordinances of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or other ordinances of the jurisdiction shall not be valid.
A separate permit is required for each proposed sign.
Commercial Address: Numerals for commercial buildings shall be conspicuously displayed on a contrasting background and shall be a minimum of 12 inches in height with a minimum stroke of 1-1/2 inches when within 50 feet of the way of travel. Buildings located between 50 and 100 feet from the way of travel shall have numerals a minimum height of 18 inches with a minimum stroke of 2 inches. Buildings located more than 100 feet from the way of travel shall have numerals a minimum of 24 inches in height with a minimum stroke of 2-1/2 inches. Numerals designating suite numbers shall be a minimum of 4 inches in height. All sizes may be reduced by 50 percent if numerals are illuminated 24 hours per day. If the building is not clearly visible from a named way of travel, the numerical designation (address) shall also be displayed near the main entrance to the property as well as at the driveway entrance that leads to the building. Property addresses shall be posted prior to requesting any inspections. If property addresses are not posted upon inspection, inspection will not be approved and a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
CO Revision Checklist: The following checklist is provided to help you prepare for the Certificate of Occupancy (CO) inspection. Please use it to perform your own building and fire safety check prior to requesting an inspection. Some of the most frequently overlooked, common safety items that should be verified are: 1. Exits, corridors, stairs and ramps: a. Unobstructed; b. No deadbolts on any other exit doors except for the main entrance; (with appropriate verbiage applied) c. Illuminated exit signs working and battery backup is operational; d. Handrails on stairs and ramps. 2. Building address is clearly posted as required, and visible from the road. 3. Fire extinguishers: a. Serviced within the last year or recently purchased with manufacturer's tag attached and dated; b. Minimum size 2-A:10-B:C; c. Mounted near the exit(s) no higher than 5 feet above the floor. 4. Combustible storage: a. At least 24 inches below the ceiling; b. Not located within required aisles; c. Not located in combustible attic space or crawl space; d. Not located in mechanical rooms. 5. Flammable liquids and hazardous materials: a. Quantities appropriate for use and storage, and consistent with amounts stated within application documents; b. Materials stored in close proximity to each other are compatible with each other; c. Stored in approved flammable liquid storage cabinet if quantities exceed 10 gallons; 6. Cooking operations: a. Hood and duct suppression system for any cooking that can produce grease-laden vapors; b. Class K fire extinguisher for deep fat frying operations. 7. Electrical a. Service panel is clear and unobstructed; b. Extension cords are not used for any form of permanent wiring; c. All temporary electrical cords in good condition; d. Electrical system and any modifications have been inspected and approved by the Department of Labor & Industries.
Prior to final building inspection scheduling, all work associated with SDAP (XX XXXXX) shall be completed and a satisfactory final SDAP inspection obtained.
This permit shall comply with all Kitsap Public Health District regulations and conditions of approval.
The uses of the subject property are limited to the uses proposed by the applicant and any other uses will be subject to further review pursuant to the requirements of the Kitsap County Code (KCC). Unless in conflict with the conditions stated and/or any regulations, all terms and specifications of the application shall be binding conditions of approval. Approval of this project shall not, and is not, to be construed as approval for more extensive or other utilization of the subject property.
Landscaping shall be installed and maintained in conformance with the requirements of Kitsap County Code (KCC) 17.500. Landscaping shall be installed and inspected prior to requesting a final inspection, or guaranteed by means of an assignment of funds or bonded in the amount of 150 percent of the cost of installation.
Drainage BMP: Infiltration Pit Connect all roof drains to the infiltration trench system as shown on the approved plans. Pit Size: Depth of Pit: 2 feet; Depth of Rock: 1.5 feet Minimum Cover: 6 inches Upslope: Setback 30 feet from drainfield, 10 feet from curtain drain Downslope: Setback 10 feet from drainfield Setback: 10 feet from property line Setback: 10 feet from structures The infiltration pit shall be inspected prior to covering; and shall be completed prior to requesting a final building inspection.
Drainage BMP: Dispersion Trench Connect all roof drains to the dispersion trench system as shown on the approved plans. Trench length: Trench width: 2 feet Trench depth: 18 inches Downslope: Setback 10 feet from drainfield Setback: 10 feet from property line Setback: 10 feet from structures Applicant shall complete the provided Operation & Maintenance Manual for privately maintained dispersion trench facilities. The completed Operation & Maintenance Manual shall be submitted to Kitsap County and the dispersion trench shall be inspected prior to requesting a final building inspection.
Drainage BMP: Gravelless Chamber Connect all roof drains to the gravelless chambers as shown on the approved plans. Number of chambers: Length of chambers: Where more than 1 chamber, set at a minimum of 6 foot on center 3 inches of gravel is required below the chambers. Trenches must be gravel-filled outside of the chambers to the top of the chamber louvers. The infiltration chambers shall be inspected prior to covering.
Drainage BMP: Bioretention Connect all roof drains to the bioretention cell as shown on the approved plans. Bottom Square Footage of Cell: Ponding Depth, 12” maximum: Engineered Soil Depth: 18 inches Side slopes: 3H:1V Setback, upslope from drainfield: 30 feet Setback, downslope from drainfield: 30 feet Setback from property line: 10 feet Setback from structures: 10 feet Bioretention area shall be protected to minimize compaction of underlying soils during construction. Bioretention system shall be inspected prior to requesting a final building inspection.
Drainage BMP: Rain Garden Direct runoff to rain garden, via a swale, pipe, or across landscaped area Bottom Square Footage of raingarden: Ponding depth, 12” maximum: Engineered Soil depth: 18 inches Side slopes: 2H:1V Setback, upslope from drainfield: 50 feet (raingarden handbook) Setback, downslope from drainfield: 10 feet (raingarden handbook) Setback from property line: 10 feet Setback from structures: 10 feet The rain garden shall be inspected prior to requesting a final building inspection.
Drainage mitigation method: Site Development Activity Permit (SDAP) All site plan construction and stormwater systems shall be installed as designed per SDAP #: Stormwater mitigation that does not match the approved SDAP will not be allowed without further SDAP review by Kitsap County Department of Community Development
Prior to completion of this permit with the Department of Community Development, the Applicant shall satisfy all conditions of a Right-of-Way Permit through the Department of Public Works for any and all work performed in the county Right-of-Way associated with this project. Apart from the Site Development Activity Permit (SDAP), the Right of Way permit may require extra work to comply with current Washington State Department of Transportation or Kitsap County Road Standards. You may contact Kitsap County Public Works, Right-of-Way Division at (360) 337-5777 to obtain a Right-of-Way permit.
Separate permits shall be obtained for any modifications to the existing fire alarm and sprinkler systems.
Site walk shall be performed, prior to occupancy, to determine location of fire lanes. Fire lanes shall be marked by approved means.
It is the responsibility of the property owner, or his/ her designee, to hire a third party inspection agency to provide special inspections for those items identified on page A00.04 and/or per the EOR. These inspections are to be performed in addition to the general inspections required per the IBC section 110.3. Reports from the third party inspections shall be available on-site for the Kitsap County building inspectors, or by other pre-approved means. The special inspection agency shall also provide a final, signed report to the building department stating that all items requiring special inspection and testing were fulfilled and reported, and, to the best of their knowledge, are in conformance with the approved design drawings, specifications, and applicable provisions of the code.

Required Permits
Type Requirement For Number Status
Fire Alarm - New System or Major Modification Close
Fire Sprinkler - Above Ground New System or Major Modification Close
Site Development Activity Permit - Commercial Issue 19-04914 Issued
Right of Way Permit No 20-03084 Issued

Associations