20-04104 Remodel Major - Residential
Address:
11968 NW PIONEER RD
SEABECK,  WA  98380
Parcel #: 212501-3-021-1002
Status: Permit has been issued to applicant.
Submitted: 9/5/2020
Approved: 10/30/2020
Issued: 12/14/2020
Closed:
Expires: 12/14/2021
Inspections:
Required: 13
Complete: 8
Total Fees:
$1,02100
Additional fees may be required
Project: REEDER - Finishing second story of attached garage; adding rec room, bathroom and kitchenette

Public Notice
Description Begin Date End Date

Contacts
:
REEDER WILLIAM S JR & MELANIE R
:
Eric Johnson with JOHNSON HOMES
:
Melanie Reeder

Contractors
CC:
JOHNSON HOMES
License #: JOHNSH*134QB

Details

Parcels
Parcel(s) associated with your permit.
Parcel Owner Address
212501-3-021-1002 REEDER WILLIAM S JR & MELANIE R 11968 NW PIONEER RD
SEABECK,  WA 98380

Submittals

Upload documents in PDF format on the following screen. The name of each file should simply identify what each submittal document is. Examples: “Floor Plans”, “Engineered Structural Plans”, "Engineered Civil Plans", “Site Plan”

Click the files link on the far right of the submittal item to upload. The files link will indicate how many documents have been uploaded.

Not uploading all required submittal documents will delay the processing of your permit.

Submittal Required Received Accepted
Approved Permit Documents and Plans: Print all files and keep onsite for inspections Yes 11/2/2020 11/2/2020
Second Information Request: Upload a letter response AND any revised, corrected, or additional documentation Yes 10/27/2020 10/28/2020
Please Download and Review All Documents: This line contains your detailed information request and when applicable, permit documents with reviewer comments Yes 10/27/2020 10/27/2020
Information Request: Upload a letter response AND any revised, corrected, or additional documentation. No 10/14/2020 10/15/2020
Upload Required Permit Documents as listed on your Required Permit Questionnaire at http://kcowa.us/permitapp No 9/9/2020 9/11/2020

Approval Steps
Follow your application through the approval process.
Step Status Date
Permit Center Processing - Building Approved 9/15/2020
Building Height Review Approval Step Not Required (Deleted) 9/9/2020
Health District Approval Processing for Building Permits Approved 9/9/2020
Environmental Review Approved 10/12/2020
Residential Zoning Review Approved 10/30/2020
Stormwater Review Approved 10/12/2020
Building Code Plan Review Approved 10/30/2020
Road Approach Research Approved 9/16/2020
Fire Marshal Review Approval Step Not Required (Deleted) 9/15/2020
Road Approach Approval Approved 9/16/2020

Reviews
Start Complete Applicant Response
9/14/2020 10/12/2020 10/14/2020
10/14/2020 10/27/2020 10/27/2020
10/27/2020 10/30/2020

Fixtures
Fixture Quantity Per Unit Value
R-Gaspipe System LPG/NATL/OIL 1 $0.00 $0.00
R-LP or Natural Gas Water Heater Vent & Combustion Air 1 $0.00 $0.00
R-Propane fuel tank 500 gallons and under 1 $0.00 $0.00
R-Sink (Lavatory, Kitchen, Mop or Bar Sink) 1 $0.00 $0.00
R-Water Heater 1 $0.00 $0.00
R-Tub and/or Shower Unit 1 $0.00 $0.00
R-Bath Fan and/or Exhaust Fan 1 $0.00 $0.00
R-Water Closet and/or Urinal 1 $0.00 $0.00
Ductless Split System 1 $0.00 $0.00
R-Cook Stove with Exhaust, LP or Natural Gas 1 $0.00 $0.00
Total: $0.00

Valuations

Valuations and fees will be validated during the review process.

Valuation Quantity Rate Value
Garage Conversion to finished heated space - Enter Square Footage 629.00 $72.74  / SQFT $45,753.46
Total: $45,753.46

Fees

Fee totals below may not reflect all fees, including fees calculated by hourly rates.

Fee Amount
Building Permit Fee, Residential $796.12
Residential Mechanical and PlumbingFee $0.00
Technology Fee $23.88
Permit Center Base Fee $90.00
State Surcharge DCD $6.50
Recording Fee 2 pages $104.50
Total : $1,021.00

Bonds
Type Number Amount Issued Expires Completed

Inspections

The inspections listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit has been issued, all inspections listed are applicable to your permit. Note: Community Development Building Final Inspections (B-Final), Commercial CO Inspection Fire Marshal (FM-CO-Final) and the Final Field Inspections (DE-FFI) are not eligible for next day inspection requests. Please allow two business days when requesting a Final inspection.

Completed On
Health District Final (Final Must Be Approved Prior To Scheduling Final Building Inspection) 9/9/2020
Residential Final Building Inspection
Residential Plumbing, Rough-In Inspection 12/16/2020
Residential Mechanical, Ventilation Rough-In Inspection 1/7/2021
Residential Mechanical, Interior Gas Piping Inspection 12/16/2020
Residential Ductless Split System Rough-In Inspection 12/16/2020
Residential Framing Inspection 1/7/2021
Residential Insulation Inspection 1/11/2021
Residential Gypsum Wallboard Inspection 1/21/2021
Residential Mechanical, Household Appliance
Residential Mechanical, Propane or Liquid Fuel Tank & Piping Inspection
Residential Mechanical, Exterior Gas Piping Inspection
Residential Gas Stove Installation Inspection

Structures
Structure Use Occupancy Type Square Footage
REEDER - Finishing second story of attached garage; adding rec room, bathroom and kitchenette Residential, one or two family dwelling

Conditions

The conditions listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit is issued, all conditions listed are applicable to your permit.

Permit Expiration: Building permits expire 365 days after permit issuance, or 180 days after the last approved inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. Additional fees may be due to reactivate the permit.
ELECTRICAL WORK. If electrical work is proposed, a separate electrical permit is required. You can contact Labor and Industries (L&I) at www.lni.wa.gov to obtain an electrical permit. Electrical systems must be inspected by L&I prior to requesting a framing inspection and final approval granted prior to requesting a final building inspection from the Department of Community Development.
Reinspection Fee: All approved plans for this permit and the printed building permit with conditions are required to be on-site for inspection purposes, and work to be inspected shall be complete and ready for inspection. If an inspection is called for and plans are not available on site, or the work is not ready for inspection, or if previously identified corrections have not been made, approval will not be granted. In addition, a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
Final Inspection Required: All building permits shall have a final inspection performed and approved by the Kitsap County Department of Community Development prior to permit expiration. The failure to request a final inspection or failure to obtain final approval prior to expiration will be documented in the legal property records on file with Kitsap County as being non-compliant with Kitsap County ordinances and building regulations and will be referred to Kitsap County Code Compliance for action.
Group U, non-habitable use only: This structure is limited to Group U occupancy use only (private garages, carports, sheds, and agricultural buildings.) Any other use will be in violation of the Kitsap County Building & Fire Code and Kitsap County Zoning Regulations unless a "Change of Use" permit is applied for, approved, issued and completed.
Unheated Structure: This structure is approved as un-heated space. If at any time this building is to be used for anything other than what it is approved for, a change of use permit shall be applied for, reviewed and approved prior to the change.
Residential Address: Numerals for residential building addresses shall be conspicuously displayed on a contrasting background and shall be a minimum of 4 inches in height with a minimum stroke of 1/2 inch. If the building is not clearly visible from a named way of travel, the numerical designation (address) shall also be displayed near the main entrance to the property as well as at the driveway entrance that leads to the building. Property addresses shall be posted prior to requesting any inspections. If property addresses are not posted upon inspection, inspection will not be approved and a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
Erosion and sedimentation control devices shall be installed in accordance with best management practices. Provide silt fence(s) along contours. Provide appropriate gravel construction entrance mat. Protect all exposed soils.
All structures shall have roof gutters. All gutters, downspouts, and yard drains must be directed at a minimum to splash blocks, (or an infiltration system, if required). Drains shall have a minimum 2% grade away from the foundation. All drainage discharges shall be located so that there is no adverse impact to downstream or adjacent properties.
This permit shall comply with all Kitsap Public Health District regulations and conditions of approval.
Existing approach is acceptable. However, any improvements or installation of another approach on this parcel will require a new road approach permit.
Demolition: All demolition debris shall be properly transported to, and disposed of within an approved solid waste facility. The property shall be left in a clean, safe condition, protected from erosion. Copies of disposal receipts from a regulated disposal or recycling facility shall be provided via the online citizen portal to the Department of Community Development before the final inspection. Any demolition work that does not remove the entire structure, shall be performed such that no structural member remains undermined or left in any position or situation that could cause harm to any person or property. Partial demolition shall not cause any portion of a building to become unsafe. For information regarding asbestos removal or lead abatement, contact Puget Sound Clean Air Agency at (206) 343-8800. All asbestos and hazardous material removal shall comply with all requirements of the Puget Sound Clean Air Agency (PSCAA). Copies of documents submitted to PSCAA shall be forwarded to the Department of Community Development before requesting the final inspection.
A Notice to Title is required prior to final inspection. This notice will be prepared and recorded by KCDCD on the applicant’s behalf. Once completed the recorded notice can be found in the submittals section of the permit.

Required Permits
Type Requirement For Number Status

Associations