Contact
20-03859 Single Family Residence - New
Address:
27757 MCINTOSH LOOP NE
KINGSTON,  WA  98346
Parcel #: 5641-000-007-0007
Status: Permit has been issued to applicant.
Submitted: 8/21/2020
Approved: 9/28/2020
Issued: 10/6/2020
Closed:
Expires: 10/6/2021
Inspections:
Required: 30
Complete: 19
Total Fees:
$8,75257
Additional fees may be required
Project: APPLE TREE POINT - Lot 7 - New Single Family Residence w/ Attached Garage

Public Notice
Description Begin Date End Date

Contacts
:
NW SIGNATURE HOMES LLC
:
NW SIGNATURE HOMES LLC
:
LaMont, Charles
:
Flescher, Russ
:
Flescher, Rick

Contractors
GENERAL:
NW Signature Homes
License #: NWSIGSH929RK

Details
Impact Fee Land Category: 210
Impact Fee Units: 1

Parcels
Parcel(s) associated with your permit.
Parcel Owner Address
5641-000-007-0007 NW SIGNATURE HOMES LLC 27757 MCINTOSH LOOP NE
KINGSTON,  WA 98346

Submittals

Upload documents in PDF format on the following screen. The name of each file should simply identify what each submittal document is. Examples: “Floor Plans”, “Engineered Structural Plans”, "Engineered Civil Plans", “Site Plan”

Click the files link on the far right of the submittal item to upload. The files link will indicate how many documents have been uploaded.

Not uploading all required submittal documents will delay the processing of your permit.

Submittal Required Received Accepted
Approved Permit Documents and Plans: Print all files and keep onsite for inspections Yes 9/29/2020 9/29/2020
Upload Required Permit Documents as listed on your Required Permit Questionnaire at http://kcowa.us/permitapp Yes 8/21/2020 8/26/2020

Approval Steps
Follow your application through the approval process.
Step Status Date
PW - Concurrency Test Review Approved 8/26/2020
Permit Center Processing - Building Approved 8/28/2020
Building Height Review Approval Step Not Required (Deleted) 8/26/2020
Health District Approval Processing for Building Permits Approved 8/26/2020
Environmental Review Approved 9/23/2020
Residential Zoning Review Approved 9/2/2020
Stormwater Review Approved 9/28/2020
Building Code Plan Review Approved 9/18/2020
Road Approach Research Approved 8/28/2020
Road Approach Approval Approved 9/9/2020
Addressing, Verification/Assignment Approved 9/2/2020
PW - ROW Review Approval Step Not Required (Deleted) 9/23/2020
Fire Marshal Review Approved 8/31/2020

Reviews
Start Complete Applicant Response
8/27/2020 9/28/2020

Fixtures
Fixture Quantity Per Unit Value
R-Fireplace-Gas, or Gas Log Insert 1 $0.00 $0.00
R-Clothes Dryer with Exhaust, Electric 1 $0.00 $0.00
R-Water Heater 1 $0.00 $0.00
R-Tub and/or Shower Unit 2 $0.00 $0.00
R-Bath Fan and/or Exhaust Fan 6 $0.00 $0.00
R-Hose Bibs 4 $0.00 $0.00
R-Clothes Washing Machine 1 $0.00 $0.00
R-Water Closet and/or Urinal 3 $0.00 $0.00
R-Dish Washer 1 $0.00 $0.00
Ductless Split System 1 $0.00 $0.00
R-Cook Stove with Exhaust, LP or Natural Gas 1 $0.00 $0.00
Total: $0.00

Valuations

Valuations and fees will be validated during the review process.

Valuation Quantity Rate Value
New unfinished, heated or unheated space - Enter Square Footage 879.00 $47.28  / SQFT $41,559.12
New covered porch, carport, covered deck - Enter Square Footage 412.00 $24.25  / SQFT $9,991.00
New Residential Floor Space, Main (1st) Floor - Enter Square Footage 2287.00 $121.24  / SQFT $277,275.88
Total: $328,826.00

Fees

Fee totals below may not reflect all fees, including fees calculated by hourly rates.

Fee Amount
State Surcharge DCD $6.50
First Half of Permit Residential Fee $2,860.79
Park Impact Fee With CPI Modifier $698.95
Road Impact Fee With CPI Modifier $694.72
Technology Fee $171.65
Permit Center Base Fee $90.00
School Impact Fee With CPI Modifier $1,369.17
Second Half of Permit Residential Fee $2,860.79
Total : $8,752.57

Bonds
Type Number Amount Issued Expires Completed

Inspections

The inspections listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit has been issued, all inspections listed are applicable to your permit. Note: Community Development Building Final Inspections (B-Final), Commercial CO Inspection Fire Marshal (FM-CO-Final) and the Final Field Inspections (DE-FFI) are not eligible for next day inspection requests. Please allow two business days when requesting a Final inspection.

Completed On
Pre-issuance inspection for Road Approach. 9/1/2020
Residential Temporary Silt & Erosion Control Inspection.*Note: This is not a standalone inspection, it will be done with all building inspections and will not be approved until final inspection. You will not need to request this inspection unless you're instructed to by your Inspector.
Residential Foundation, Footing Inspection 10/28/2020
Residential Footing, Deck or Porch inspection 10/28/2020
Residential Foundation, Stem Wall Inspection 11/5/2020
Residential Drainage Inspection - Downspout system (prior to backfill) 11/13/2020
Residential Underfloor framing (prior to sub-floor) 11/20/2020
Residential Exterior Shear Wall Nailing Inspection 12/18/2020
Residential Interior Shear Wall Nailing Inspection 1/26/2021
Residential Plumbing, Rough-In Inspection 1/21/2021
Residential Mechanical, Ventilation Rough-In Inspection 1/28/2021
Residential Mechanical, Interior Gas Piping Inspection 1/21/2021
Residential Ductless Split System Rough-In Inspection 1/21/2021
Residential Mechanical Fireplace Rough-In Inspection 1/21/2021
Residential Framing, Deck or Porch inspection 1/26/2021
Residential Framing Inspection 1/26/2021
Residential Insulation Inspection 2/1/2021
Residential Gypsum Wallboard Inspection 2/11/2021
Residential Mechanical, Propane or Liquid Fuel Tank & Piping Inspection
Residential Mechanical, Exterior Gas Piping Inspection
Residential Gas Stove Installation Inspection
Road approach form inspection prior to pour
Road Approach - Final
Inspection of secondary storm drainage system 11/13/2020
Deferred Impact Fees Must be paid in full before requesting final inspection. Please call 360-337-5777.
Residential Final Building Inspection
Soil Management
Final Field Inspection
Health District Final (Final Must Be Approved Prior To Scheduling Final Building Inspection) 2/16/2021
Residential Certificate of Occupancy Approval Inspection

Structures
Structure Use Occupancy Type Square Footage
APPLE TREE POINT - Lot 7 - New Single Family Residence w/ Attached Garage Residential, one or two family dwelling / Residential accessory structure, private garage, carport, deck, shed 3578

Conditions

The conditions listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit is issued, all conditions listed are applicable to your permit.

Permit Expiration: Building permits expire 365 days after permit issuance, or 180 days after the last approved inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. Additional fees may be due to reactivate the permit.
ELECTRICAL WORK. If electrical work is proposed, a separate electrical permit is required. You can contact Labor and Industries (L&I) at www.lni.wa.gov to obtain an electrical permit. Electrical systems must be inspected by L&I prior to requesting a framing inspection and final approval granted prior to requesting a final building inspection from the Department of Community Development.
Reinspection Fee: All approved plans for this permit and the printed building permit with conditions are required to be on-site for inspection purposes, and work to be inspected shall be complete and ready for inspection. If an inspection is called for and plans are not available on site, or the work is not ready for inspection, or if previously identified corrections have not been made, approval will not be granted. In addition, a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
Final Inspection Required: All building permits shall have a final inspection performed and approved by the Kitsap County Department of Community Development prior to permit expiration. The failure to request a final inspection or failure to obtain final approval prior to expiration will be documented in the legal property records on file with Kitsap County as being non-compliant with Kitsap County ordinances and building regulations and will be referred to Kitsap County Code Compliance for action.
Certificate of Occupancy Approval Inspection. No building or structure shall be used or occupied, until the final inspection and the occupancy approval inspection have been approved. Approval of the certificate of occupancy inspection shall not be construed as an approval of any violation of the provisions of this code or of other ordinances of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or other ordinances of the jurisdiction shall not be valid.
Residential Address: Numerals for residential building addresses shall be conspicuously displayed on a contrasting background and shall be a minimum of 4 inches in height with a minimum stroke of 1/2 inch. If the building is not clearly visible from a named way of travel, the numerical designation (address) shall also be displayed near the main entrance to the property as well as at the driveway entrance that leads to the building. Property addresses shall be posted prior to requesting any inspections. If property addresses are not posted upon inspection, inspection will not be approved and a re-inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.
Erosion and sedimentation control devices shall be installed in accordance with best management practices. Provide silt fence(s) along contours. Provide appropriate gravel construction entrance mat. Protect all exposed soils.
All structures shall have roof gutters. All gutters, downspouts, and yard drains must be directed at a minimum to splash blocks, (or an infiltration system, if required). Drains shall have a minimum 2% grade away from the foundation. All drainage discharges shall be located so that there is no adverse impact to downstream or adjacent properties.
Prior to requesting the Final inspection for this building permit, all work authorized by the associated Site Development Activity Permit (SDAP) shall be completed; the applicant shall obtain approval of all required SDAP inspections, including the Final inspection; and the applicant shall upload all required Engineer’s Certifications and close-out documents to the SDAP record, via the Online Permit Center.
This permit shall comply with all Kitsap Public Health District regulations and conditions of approval.
No final inspection or occupancy approval will be granted until all impact fees are paid. This permit is subject to the payment of impact fees. Impact fees must be paid at time of permit issuance, or if deferred, must be paid prior to final inspection.
Existing approach is acceptable. However, any improvements or installation of another approach on this parcel will require a new road approach permit.
Construct per Section (AA) of the Exhibit. Pave approach from existing road to edge of Right of Way/Property line or 13 feet, whichever is greater. Match existing pipe. Maintain existing grade of driveway.
Construct per Section (AA) of the Exhibit. Grade approach to drain away from County Roadway to ditch line. Pave approach from existing road to edge of Right of Way/Property line or 13 feet, whichever is greater. Provide culvert pipe with minimum dimensions of 20 feet in length and 12 inches in diameter. All pipe shall be "Schedule A" strength.
Construct per Section (AA) of the Exhibit. Grade approach to drain away from County Roadway. Pave approach from existing road to edge of Right of Way/Property line or 13 feet, whichever is greater. No culvert pipe required.
Construct per Section (AA) of the Exhibit. Grade approach to direct water to roadway thickened edge asphalt or curbing. Pave Approach from existing road to edge of Right of Way/Property Line or 13-feet, whichever is greater. No culvert pipe required.
Approach shall be removed and ditch restored to original condition, upon completion of logging. Temporary approach shall be constructed per Section (AA) of the Exhibit. Grade approach to drain away from County road toward ditch line. Provide culvert pipe with minimum dimensions of 20 feet in length and 12 inches in diameter. All pipe shall be "Schedule A" strength.
Construct approach per Section (AA). Grade approach to drain away from roadway. Construct an entry mat of 2 to 4 inch rock for a minimum distance of 100 feet. If needed, provide a culvert 20 feet in length and 12 inches in diameter. All pipe shall be “Schedule A” strength. Entire approach shall be removed at the end of six months and the ditch restored to original condition.
A 6-foot minimum clearance from all existing culverts must be maintained. All work must be consistent with existing stormwater and/or road approach ordinances. Comply with Section A-A of Figure 4-1 of KC Road Standards. If this work will cause road closures or detours, you must file a traffic plan with Kitsap County Public Works including specific dates and durations of such action. All culvert pipes must meet WSDOT Schedule "A" specifications. Asphalt/concrete from edge of existing road surface to the property line or 13 feet, whichever is greater. This permit is issued for access connection only; additional permits are required for road construction, utilities and infrastructure construction.
Drainage mitigation method: Site Development Activity Permit (SDAP) All site plan construction and stormwater systems shall be installed as designed per SDAP #:05-27590 Stormwater mitigation that does not match the approved SDAP will not be allowed without further SDAP review by Kitsap County Department of Community Development
This permit shall comply with all of the conditions of approval of the land segregation for LOT 007, APPLE TREE POINT PHASE 1B, ACCORDING TO THE PLAT RECORDED IN VOLUME 35 OF PLATS, PAGE(S) 14-16, INCLUSIVE, RECORDS OF KITSAP COUNTY, WASHINGTON; SITUATE IN KITSAP COUNTY, WASHINGTON.
This lot is considered an historic lot and may utilize Kitsap County Code (KCC) 17.420.060 footnote 42b. The lot may use that residential zoning classification that most closely corresponds to the dimension or dimensions of record.
Required Minimum Zoning Setbacks- Minimum Front: 20' Southwest property line Minimum Side: 5' Minimum Side: 5' Minimum Rear: 10'
All lots shall direct roof and lot runoff to the secondary drainage system per the Final Accepted Drainage Plans on file with Development Services and Engineering, under SDAP 05-27590. At the time of Building Permit Application, the owners shall submit a plan of the roof and yard drainage conveyance system to the building department for review and acceptance. This system shall be installed and accepted prior to scheduling the final building permit inspection. Maintenance and repair of the secondary drainage system, roof and yard drains and appurtenances shall be the responsibility of the individual homeowners.
Prior to requesting a final building permit inspection, the applicant shall verify that all disturbed areas have been amended with suitable onsite soils.

Required Permits
Type Requirement For Number Status

Associations