Contact
19-02620 Right of Way Permit
Address:
26200 James Lane NE
Kingston,  WA  98346
Parcel #: 262702-4-082-2006
Status: Active - Permit has been activated by applicant and work to commence.
Submitted: 6/10/2019
Approved: 6/24/2019
Issued: 6/24/2019
Closed:
Expires:
Inspections:
Required: 14
Complete: 12
Project: Road Frontage and Offsite Utilities Connections for the Seaside Kingston Project (SDAP 18-02605)

Public Notice
Description Begin Date End Date

Contacts
:
ERIC CLARKE w/ Element Residential, Inc.
:
ELEMENT RESIDENTIAL INC

Contractors
CC:
ELEMENT RESIDENTIAL INC
License #: ELEMERI870LF
CERT LIABILITY INS:
ELEMENT RESIDENTIAL INC
License #: CC1800888
CC:
SEASIDE KINGSTON LLC
License #: SEASIKL821L2
CERT LIABILITY INS:
SEASIDE KINGSTON LLC
License #: AC010001320

Details
Nearest Cross Street: West Kingston Road
Secondary Street:
Estimated job start date: 06/14/2019
Estimate Date of work complete: 02/28/2020
Who will be doing the work?: PROPERTY OWNER (OWNER CONTRACTOR)
Who are you doing work for?: Self
Right of Way Excavation Required?: Yes
Right of Way Asphalt Disturbance?: Yes

Parcels
Parcel(s) associated with your permit.
Parcel Owner Address
262702-4-081-2007 SEASIDE KINGSTON LLC **NO SITUS ADDRESS **
UNKNOWN,  WA 00000
262702-4-082-2006 SEASIDE KINGSTON LLC 26220 LINDVOG RD NE
KINGSTON,  WA 98346
262702-4-079-2001 SEASIDE KINGSTON LLC 26271 LINDVOG RD NE
KINGSTON,  WA 98346
262702-4-080-2008 SEASIDE KINGSTON LLC **NO SITUS ADDRESS **
UNKNOWN,  WA 00000

Submittals

Upload documents in PDF format on the following screen. The name of each file should simply identify what each submittal document is. Examples: “Floor Plans”, “Engineered Structural Plans”, "Engineered Civil Plans", “Site Plan”

Click the files link on the far right of the submittal item to upload. The files link will indicate how many documents have been uploaded.

Not uploading all required submittal documents will delay the processing of your permit.

Submittal Required Received Accepted

Approval Steps
Follow your application through the approval process.
Step Status Date

Reviews
Start Complete Applicant Response

Fixtures
Fixture Quantity Per Unit Value
Total: $0.00

Valuations

Valuations and fees will be validated during the review process.

Valuation Quantity Rate Value
Total: $0.00

Fees

Fee totals below may not reflect all fees, including fees calculated by hourly rates.

Fee Amount
Total : $230.00

Bonds
Type Number Amount Issued Expires Completed

Inspections

The inspections listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit has been issued, all inspections listed are applicable to your permit. Note: Community Development Building Final Inspections (B-Final), Commercial CO Inspection Fire Marshal (FM-CO-Final) and the Final Field Inspections (DE-FFI) are not eligible for next day inspection requests. Please allow two business days when requesting a Final inspection.

Completed On

Structures
Structure Use Occupancy Type Square Footage

Conditions

The conditions listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit is issued, all conditions listed are applicable to your permit.


Required Permits
Type Requirement For Number Status

Notes

Associations