Contact
19-04914 Site Development Activity Permit - Commercial
Address:
3700 NW ANDERSON HILL RD
SILVERDALE,  WA  98383
Parcel #: 172501-4-104-2004
Status: Permit has been issued to applicant.
Submitted: 10/23/2019
Approved: 7/9/2020
Issued: 8/6/2020
Closed:
Expires: 8/10/2021
Inspections:
Required: 15
Complete: 3
Total Fees:
$4,29490
Additional fees may be required
Project: Central Kitsap School Bldg 900 - redevelopment of building, parking lot, and surrounding

Public Notice
Description Begin Date End Date

Contacts
:
Vicki Olson with CENTRAL KITSAP SCHOOLS
:
Central Kitsap School District
:
Katherine Maxey with AHBL INC>
:
Vail, Mark
:
AHBL*
:
Steve Davis
:
Haskins, Brandon
:
Pease and Sons

Contractors
CC:
PEASE / SONS INC
License #: PEASES*302P0

Details
Impact Fee Land Category:
Acres:
Impact Fee Units:
Permit Base Hours: 48

Parcels
Parcel(s) associated with your permit.
Parcel Owner Address
172501-4-104-2004 CENTRAL KITSAP HS JR HIGH & ADMINISTRATION 10332 FRONTIER PL NW
SILVERDALE,  WA 98383

Submittals

Upload documents in PDF format on the following screen. The name of each file should simply identify what each submittal document is. Examples: “Floor Plans”, “Engineered Structural Plans”, "Engineered Civil Plans", “Site Plan”

Click the files link on the far right of the submittal item to upload. The files link will indicate how many documents have been uploaded.

Not uploading all required submittal documents will delay the processing of your permit.

Submittal Required Received Accepted
Approved Permit Documents and Plans: Print all files and keep onsite for inspections Yes 7/28/2020 7/28/2020
Upload documents required prior to pre-construction meeting Yes 7/28/2020
Second Information Request: Upload a letter response AND any revised, corrected, or additional documentation Yes 7/6/2020 7/7/2020
Please Download and Review All Documents: This line contains your detailed information request and when applicable, permit documents with reviewer comments Yes 6/30/2020 6/30/2020
Information Request: Upload a letter response AND any revised, corrected, or additional documentation. No 3/11/2020 3/12/2020
Upload Required Permit Documents as listed on your Required Permit Questionnaire at http://kcowa.us/permitapp No 10/23/2019 10/28/2019

Approval Steps
Follow your application through the approval process.
Step Status Date
Application has been submitted and is pending acceptance Approved 10/25/2019
Review Application Submittal for Completeness Approved 11/8/2019
PW - Concurrency Test Review Approved 12/13/2019
Notice of Application Approval Step Not Required (Deleted) 11/12/2019
Distribute NOA Approval Step Not Required (Deleted) 11/12/2019
SDAP Processing - SDAP Processing by Hearing Examiner Clerk Approved 7/9/2020
Building Code Plan Review Approved 3/12/2020
Survey Review Approved 11/25/2019
Planning/Zoning Compliance Review Approved 7/8/2020
Environmental Review Approved 6/12/2020
State Environmental Policy Act (SEPA) Approval Step Not Required (Deleted) 3/11/2020
Solid Waste Review Approval Step Not Required (Deleted) 1/9/2020
Stormwater Review Approved 1/9/2020
Traffic/Roads Review Approved 3/18/2020
Fire Marshal Review Approved 11/8/2019
Health District Approval Approved 12/4/2019
Public Works Sewer Division Approved per Public Works 12/17/2019
Review for compliance with non-motorized access requirements Approved 12/13/2019
Traffic review by Public Works Approved 3/27/2020
PW - ROW Review Approved 3/11/2020
Reviewing Information Request Letter Approved 7/9/2020
Acceptance Letter Approved 7/9/2020

Reviews
Start Complete Applicant Response
11/7/2019 1/10/2020 3/11/2020
3/11/2020 6/17/2020 7/6/2020
7/6/2020 7/9/2020

Fixtures
Fixture Quantity Per Unit Value
Total: $0.00

Valuations

Valuations and fees will be validated during the review process.

Valuation Quantity Rate Value
Total: $0.00

Fees

Fee totals below may not reflect all fees, including fees calculated by hourly rates.

Fee Amount
HD-1011 OSS SDAP $145.00
Application Fee Deposit $6,240.00
Technology Fee $62.40
Permit Center Base Fee $90.00
Development Engineering Inspection Hours $942.50
Reviewer Hours $3,055.00
Application Fee Refund/Invoice -$6,240.00
Total : $4,294.90

Bonds
Type Number Amount Issued Expires Completed
Erosion Control Surety 23209085 $5,000.00 7/22/2020 7/22/2021
Liability Insurance Certificate GLA0182644-04 $0.00 9/1/2019 9/1/2020

Inspections

The inspections listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit has been issued, all inspections listed are applicable to your permit. Note: Community Development Building Final Inspections (B-Final), Commercial CO Inspection Fire Marshal (FM-CO-Final) and the Final Field Inspections (DE-FFI) are not eligible for next day inspection requests. Please allow two business days when requesting a Final inspection.

Completed On
On-site preconstruction meeting 7/31/2020
Level 2
Clearing Limits Flag 8/10/2020
DE -Temporary Silt & Erosion Control Inspection; initial inspection 8/10/2020
DE -Temporary Silt & Erosion Control Inspection; recurring inspection
Storm Structures and Pipe Alignment
Inspection of secondary storm drainage system
Sidewalk form inspection prior to pour.
Sidewalks - Safety Items
Soil Management
Landscape Inspection
Public Works Stormwater Final Field Inspection (Public System Only)
As-Built inspection for project closeout
Engineer's certification is required to be submitted before requesting final inspection. Please see permit conditions for the list of documents needed and contact your engineer.
Final Field Inspection

Structures
Structure Use Occupancy Type Square Footage

Conditions

The conditions listed below are standard for all permits of this type and may not apply to your specific permit. Once your permit is issued, all conditions listed are applicable to your permit.

It is the responsibility of the applicant to print and bring to the pre-construction meeting two copies of the Accepted Plans. Accepted Plans shall be full-size plans, printed on minimum 22” x 34”, and shall be to scale. If the printed Accepted Plans are not brought to the pre-construction meeting, the Site Development Activity Permit cannot be issued. One copy of the printed plans will remain on file at the Department of Community Development, and one copy is required to be onsite throughout the construction period. Failure to have the Accepted Plans onsite may result in requested inspections not being approved.
Submittal of two blackline copies of as-built plans, an electronic PDF (once as-built copies have been approved). All sheets containing road and drainage plans, profiles and associated details shall be included in the as-built set. It is not necessary to include grading and erosion control plans and details. The as-built plan set shall be stamped "RECORD DRAWING" and shall be signed and stamped by a professional engineer or land surveyor.
Completion, to the satisfaction of Development Services and Engineering, of all work indicated on the plans.
The engineer shall provide certification to Kitsap County that the drainage conveyance pipes and structures were installed in compliance with the accepted plans.
The initial permit fee for all SDAPs applies to review and processing through permit approval. All review, inspection and processing after the date of the approval letter will be charged at the DCD hourly rate. All fees must be paid prior to final inspection.
Work within the county right-of-way requires a permit to perform work in the right-of-way from the Kitsap County Department of Public Works.
The engineer shall provide certification to Kitsap County that the soils under all pollution generating pervious surfaces have been amended.
Permanent stabilization and restoration of the project site. Final replanting may be delayed to the appropriate season, provided temporary soil stabilization measures are in place and financial security is provided to assure the completion of work.
This project includes the construction of rock walls or other retaining facilities that either exceed four feet in height or sustain a surcharge. A separate building permit with an engineered design is required for such walls. This note shall be placed on the face of the final construction drawings.
Prior to completion of this permit with the Department of Community Development, the Applicant shall satisfy all conditions of a Right-of-Way Permit through the Department of Public Works for any and all work performed in the county Right-of-Way associated with this project. Apart from the Site Development Activity Permit (SDAP), the Right of Way permit may require extra work to comply with current Washington State Department of Transportation or Kitsap County Road Standards. You may contact Kitsap County Public Works, Right-of-Way Division at (360) 337-5777 to obtain a Right-of-Way permit.

Required Permits
Type Requirement For Number Status
Conditional Use Permit - Minor Revision Issue 19-03608 Finaled
Right of Way Permit No 20-03084 Issued

Notes

Associations